Intuitive Machines Q2 2023 Earnings Call Transcript

There are 8 speakers on the call.

Operator

Ladies and gentlemen, greetings and welcome to the Intuitive Machines Second Quarter 2023 Earnings Conference Call. At this time, all participants are in a listen only mode. A brief question and answer session will follow the formal presentation. As a reminder, this conference is being recorded. It is now my pleasure to introduce your host, Josh Marshall.

Operator

Please go ahead, sir.

Speaker 1

Good afternoon. Welcome to Intuitive Machine's 2nd quarter 2023 earnings call. Chief Executive Officer, Steve Altomis and Chief Financial Officer, Eric Salle, are leading today's call. Before we begin, please note that some of the information discussed during Today's call will consist of forward looking statements setting forth our current expectations with respect to future of our business, the economy and other events. These include projections of financial items, statements on plans and objectives and management expectations of future economic performance.

Speaker 1

The company's actual results could differ materially from those indicated in any forward looking statements due to many factors. These factors are described under forward looking statements in the company's earnings press release and the company's most recent 10 Q filed with the SEC. We do not undertake any obligation to update forward looking statements. We also expect to discuss certain financial measures and information that are non GAAP measures as defined in applicable SEC rules and regulations. Reconciliations to the company's GAAP measures are included in the earnings release filed on Form 8 ks.

Speaker 1

Finally, we are posting an earnings call presentation on our website, which provides additional context Investors, now I'll turn the call over to Steve Altomis.

Speaker 2

Thank you, Josh. Welcome, everyone, to the Intuitive Machine's 2nd Quarter 2023 earnings call. I'll begin today with a brief overview of our company for any new investors and analysts online. Then I'll provide updates across the company's 4 business units followed by a summary of the quarter and upcoming milestones. After, I will hand the call to our Chief Financial Officer, Eric Sallee, for a review of our financial results for the Q2 of 2023.

Speaker 2

Intuit Machines is a space infrastructure and services company founded in 2013 that contributes to establishing lunar infrastructure and commerce on the moon. We believe the company has a 1st mover position in development of lunar space and operates through 4 distinct business areas: Lunar Access Services, Lunar Data Services, Orbital Services and Space Products and Infrastructure, each with a specific focus and set of services. Lunar Access Services provide reliable and affordable means for governments, Intuitive Machines has developed a complete lunar program that includes mission control, our Nova C Lunar Lander, a space to ground communications network a series of launch vehicle contracts with SpaceX. The company has 3 missions on the flight manifest with plans to increase the frequency and complexity of missions over time. Lunar Data Services is a private and secure network called the Lunar Data Network that sends and receives secure communications, navigation to and from the moon.

Speaker 2

The LDN is designed to support data relay services for spacecraft in cislunar space and systems on the lunar surface. We expect LDN to provide backup services to NASA and the U. S. Space Force. Orbital Services provide In space orbital services for commercial and government organizations.

Speaker 2

These services include repair, refueling and raising the orbits of existing satellites as well as Rideshare. Finally, Space Products and Infrastructure offers its customers reliable and cost effective space products. These offerings include propulsion systems, navigation systems, lunar mobility vehicles, including rovers and drones, power infrastructure and Human Habitation Systems. Intuitive Machine's core business unit supports NASA's $93,000,000,000 Artemis program and extends across new revenue streams including defense and energy. With that, let's move into our Q2 operational highlights.

Speaker 2

During the Q2, we were laser focused on the final assembly process in preparing IM1 for launch. The test campaign set forward last quarter to prepare IM-one for launch included a complete engine vibration test, A complete spacecraft test run, engine acceptance and final assembly and integration. Today, our IM-one Lander is complete and will be prepared for delivery in September. The company has secured a launch window from pad 39A preserving a 6 day launch window starting on November 15. In case of unfavorable launch conditions in November or a change due to high Priority launches on our Launchpad, we have a second launch window in December.

Speaker 2

Right now, we are manifested on a Falcon 9 launch scheduled in November. With the congestion for launches using Pad 39A at Kennedy Space Center, we recognize that higher priority missions are always possible. However, our attention remains firmly fixed on the aspects we can control. Our I'm 1 Nova C is Completely built and we continue to execute the rest of our business with the same intensity that will deliver a lunar lander ready to go to the moon in September. Progress continues throughout the company.

Speaker 2

We're building the primary IM2 structure, integrating payloads and mechanisms to the 2nd lander. This includes the integration of NASA's Trident drill that will prospect for lunar water ice, completing payload deployment mechanisms and the anticipated completion of our rocket fueled drone, Micronova in September. This remarkable progress toward I'm II is a Capitalization on valuable insights gained from IM-one. We expect IM-two to be completed in the company's new lunar production and operations facility At the Houston Spaceport, our ribbon cutting ceremony scheduled for September 29th will officially start operations Inside our new home designed to support NASA's Artemis program and growing commercial demand for each of our 4 business units. As our near term launch approaches, we're focusing on sustainable and longer term exploration.

Speaker 2

Throughout the first half of twenty twenty three, we invested time in advancing our in space capabilities to extend our lunar missions and apply those technologies using nuclear power in the orbital services market. Turning to recent awards and proposals. In July, NASA's Space Technology and Mission Directorate awarded a $15,000,000 tipping point initiative to an Intuitive Machines team for the development of a radioisotope power system that may enable lunar assets like NovaSea, to survive and operate through the lunar night and in permanently shadowed regions of the moon. The lunar night cycle refers to the period of darkness on the moon that lasts approximately 14 Earth days. During this time, temperatures on the lunar surface drastically, reaching as low as minus 2 79 degrees Fahrenheit.

Speaker 2

By surviving the lunar night, A mission on the surface of the moon could extend from 2 earth weeks to several years. Intuitive Machine's role is to assist Xeno Power in developing an interoperable amortium-two forty one radioisotope Sterling generator that may be integrated into lunar landers to enable it to survive the lunar night cycle. Unlocking this capability in support of NASA's Artemis program is paramount for Intuitive Machines and the entire space exploration industry. The application of these radioisotope power systems extends beyond lunar surface longevity. Intuitive Machines entered the proposal pool Low power contract this month.

Speaker 2

The proposal calls for Intuitive Machines and its team to develop satellite positioning and maneuverability solutions Using radioisotope power systems in support of NASA's gateway, a multipurpose outpost orbiting the moon. Intuitive Machines' Jets and team leverage its nuclear power systems, power generation and space exploration expertise, Building on our existing lunar fission surface power reactor contract, which we briefed the Department of Energy and NASA, The 2nd phase, dollars 4,500,000 award for our Fission Surface Power contract is expected later this year. While NASA remains a fundamental pillar of our success, these nuclear in space opportunities spread across the defense, Energy and Civil Agencies represent an exciting opportunity for Intuitive Machines to evolve as a dynamic, adaptable and forward looking company. In April, NASA awarded its 5 year 719,000,000 Dollar Omnibus Multi Engineering Services contract referred to as OMS to develop technologies enabling services, including satellite servicing and refueling, satellite repositioning and orbital debris removal. In the days leading up to this call, the U.

Speaker 2

S. Government Accountability Office affirmed NASA's evaluation of Ohm's 3 proposals, resulting in Intuitive Machines retaining the award. We expect to start our transition soon and look forward to growing in Orbital Services marketplace. Since the Q1, Intuitive Machines has submitted more than $3,000,000,000 in proposals spread across aerospace and defense sectors, including human spaceflight. We submitted our bid as the prime contractor for NASA's Lunar Terrain Vehicle Services contract As the Moonracer team for the exploration and development of the South Pole region of the moon, the lunar terrain vehicle is a key part of NASA's Artemis program and would be Intuitive Machine's prime contractor debut in human spaceflight.

Speaker 2

The company is taking steps to positively mitigate the effects of outside For example, NASA's CP22, which calls for a NovaSeq class to deliver a drill to the moon's South Pole has moved from the Q3 to November And the agency's Near Space Network Services contract awards have moved from 2023 to early 2024. Before I conclude, I wanted to mention a new Director. To help support and facilitate our growth trajectory, we have appointed Nicole Seligman To the Intuitive Machines Board of Directors, Nicole's distinguished career has included senior leadership roles in global public companies. With Nicole's valuable expertise now enriching our Board, we continue to forge ahead in our endeavors. With that, I'll turn the call over to Intuitive Machine's Chief Financial Officer, Eric Celli.

Speaker 3

Thanks, Steve, and thanks to everyone joining us today. I'll begin by going through our Q2 2023 results. We ended the 2nd quarter with a contracted backlog of $137,300,000 This backlog does not include the NASA OMS III contract, which as Steve mentioned earlier, the protest result in our favor last week, clearing the way for us to start Transition and begin work in Q4 of this year. Driven primarily by NASA's Commercial Lunar Payload Services Initiative or CLPS, The company concluded Q2 'twenty three with $18,000,000 in revenue compared to $19,200,000 in revenue in the Q2 of 2022. Operating loss was negative $13,200,000 versus negative $2,200,000 in the year prior period.

Speaker 3

This is primarily due to schedule impacts Steve mentioned earlier as well as public company costs. We ended the Q2 of 'twenty three with a Cash balance of $39,100,000 Given delays to government customer acquisition timelines and U. S. Federal budget uncertainty, With that, operator, we are now ready for questions.

Operator

Thank you. Ladies and gentlemen, we will now be conducting a question and answer Our first question comes from the line of Suji Desilva with ROTH MKM, please go ahead.

Speaker 4

Hi, Steve. Hi, Eric. Congratulations on the progress here. Certainly, a lot of exciting things coming. Maybe you can talk about the program push outs and, I guess, the withdrawn guidance.

Speaker 4

Maybe you can give us a sense, Eric, maybe or Steve, The drivers here and how much each one is a factor U. S. Government spending uncertainty versus what you cited in the press release, which is program delays and then Launchpad congestion. I just want to understand which of these maybe is more of a meaningful factor?

Speaker 2

Yes, Suji, thanks for the question. This is Steve. Let's see, with respect to U. S. Government funding, it's really the federal budget in this leading up to an election year provides an overall sense of uncertainty.

Speaker 2

But We still see a commitment to human spaceflight and the Artemis program. We share generous bipartisan support For the NASA budget, which is our primary source, and in particular, you see that growth in human spaceflight with our contract bid for the Lunar Terrain Vehicle. You also can look at geopolitics and globally and see the Russian launch Recently to the Lunar South Pole and the Indian launch to the Lunar South Pole, which means this is right upon us and It's good that we have a commitment from the federal government to support the human spaceflight programs. However, we did see some delays in Major awards like the OMS contract, we talked about the protest. That award was initially offered In July and had moved out now to post protest to the November time frame.

Speaker 2

We also saw the NearSpace Network services, the communications program that we bid on between the 1st and second quarter. We're in a really good position for that one partnering with and teaming with Raytheon. That moved from late Q3, early Q4 to the Q1 of 2024. And then also, we saw the The CLPS award or the CLPS proposal for CP22, which is the next mission up in the sequence of missions Coming from the NASA CLPS program out of the Science Mission Directorate, that moved from the Q3 into well into the Q4 before they make that award. And then other smaller ones like the Tipping Point, which we did receive an award, we expected that award in the May timeframe and it wasn't until July we saw that award That will affect implementation and when we on ramp for that contract.

Speaker 2

All good news. They're all commitments that Still stay with us. It's just they're gently sliding to the right and that has an effect on things. I think what you can look at terms of what's left to go this year, we have some significant milestones, as I've been talking about, in terms of our Mission 1 Launched in November, the next CLPS award to occur late November, the LTV award to occur possibly here in the Q4, The ohms transition to execution will occur in the Q4. On both the follow on for the Fission Surface Power Reactor Next Phase and the Jetson AFRL proposal, we expect both of those to start In this late Q3 timeframe.

Speaker 2

And so that's kind of where we stand and that's kind of an assessment Where we're going with the external environment and its pressures on us.

Speaker 4

Okay. I appreciate that color and understand these programs can move around obviously. Maybe specifically on ohms, now that you are starting to line that up for revenue, just a sense of how that progresses linearity wise. Is it Front loaded, back end loaded, does it kind of progress relatively steadily through the quarters once, I guess, let's just say 1Q 2024 is in the 1st full quarter?

Speaker 2

Well, right now, we'll start with the negotiation portion of the contract to kind of set the transition time period. There's several dates ahead of us that NASA is considering on when we actually move from transition to execution. And then there'll be a ramp up From a time depending on what the initial task orders will be, we don't expect it to be the total value divided by the number of months That are on that contract. We actually think that there'll be a ramp up period and we're kind of thinking about how that will unfold here in the November, December Time frame.

Speaker 4

Got it. And then lastly on and I'll move on here. The LTV contract sounds interesting to me in the sense that Maybe your first win is a prime. What's your likelihood of you think winning that versus competition just to handicap that because I think that will be an important milestone for you guys? Thanks.

Speaker 2

Yes. What we've done, as you know, we try to show a great deal of transparency to our pipeline And what we pipeline of opportunities and we give a PGO and a P win for each one. We assess the competition, Understand the strength of the teaming and then come out with that P win associated. We think that will be multiple awards And we know there's a limited field of entrance and our team is an exceptionally strong team with Intuitive Machines as a prime And Boeing and Northrop Grumman and ABL as our subcontractors.

Speaker 4

Okay. Thanks, Steve. Thanks, everybody.

Operator

Thank you. Our next question comes from the line of Austin Moller with Canaccord Genoviti, please go ahead.

Speaker 5

Hi, good afternoon, Steve and Eric.

Speaker 3

Afternoon,

Speaker 5

Austin. Just my first question here, just to clarify. So the timing of the NASA contract award For essentially what would be the IM4 mission, that's still expected in the Q4, right? That would be with fiscal 2023 already appropriated dollars, correct?

Speaker 2

So Austin, it was initially trying to get out by the end of September, but NASA delayed that towards the end of November. So we saw essentially a 2 month slip in that NextClips mission.

Speaker 5

Okay. That's helpful. And then, do you expect your $39,000,000 cash balance to be sufficient to execute on the contracts under your plate? Or do you expect more cash receipts The current NASA contracts like OMS and the other I'm missions to satisfy your needs there?

Speaker 3

Yes. We expect our current cash balance and the cash receipts from our existing contracts To be sufficient to take care of our cash needs, I mean, I think you saw that our operating cash flow in Q2 was actually positive, Which is a great sign. Obviously, you've seen, I think, as you're following us, Austin, our cash is lumpy. Our inflows and outflows are both milestone based. And so from quarter to quarter, you've got some lumpiness in there and you've really got to look at this on a full year basis.

Speaker 3

And we've always tried to be resilient as we've talked about To be able to withstand these types of program delays like this. So the cash in our balance sheet plus the milestones we have on the books It should take us through. And then we also obviously have the $50,000,000 committed equity facility, Which we can use opportunistically to provide further cushion if needed.

Speaker 5

Okay. And then just one more, if I May, can you expand on what you're seeing in the congressional versions of the fiscal year 'twenty four NASA budget in regards to Cliffs and other important programs to you, I mean, as you mentioned on the call earlier, Russia sending Luna 25 to the lunar south pole doesn't seem Indicative to me that there's going to be any slowdown there in terms of the program record.

Speaker 2

Yes. So Austin, we do see a commitment in the Artemis program in human spaceflight. Where that will affect it is The overall pressure across the U. S. Federal budget will affect and force NASA to have to make some trades Within their budget to lower priority items.

Speaker 2

And so you'll see a fencing, I believe, in terms of technology dollars that are flowing Out from the Space Technology Mission Directorate and competing with science dollars that will flow out of the Science Mission Directorate across the science portfolio And who will receive those dollars, those limited dollars that will come out of what appears to be a reduced NASA budget, At least in the negotiations that are occurring between the House and the Senate today. So that's where we really see that, that sorting out will occur, but We still see that the highest priority items from the human spaceflight Artemis program, namely the human lander, Namely the spacesuits and the lunar terrain vehicle as the top items that should receive funding.

Speaker 5

Okay, great. Thanks for all the details there.

Operator

Thank you. Our next question comes from the line of Laura Lee with Deutsche Bank. Please go ahead.

Speaker 6

Hi, team. Congratulations on good execution last quarter. And it's nice to see your M1 launch Scheduled. And my question would be, could you like elaborate more on the next steps prior to the launch?

Speaker 2

Yes. Thanks, Laura. Appreciate the question. Like I said, we've made some Incredible execution progress over the past quarter and subsequent to date, completing a full Burn of our flight engine and the hot fire test, which is a test where the engine is integrated with the lunar lander And then we fill that with propellants and fire that and that was a wild success. Going forward with the lander assembly complete, We'll run about 2 weeks of flight software functional testing to make sure that every pinout connection and every Wire harness works in conjunction with our flight software.

Speaker 2

That series of testing will then go into electromagnetic interference test to make sure that there's no adverse effect on our payloads with when the lander is all powered up. And then we'll do kind of Center of gravity measurements, mass measurements and get the vehicle all ready to be buttoned up in its shipping container and prepared to ship to the Cape, and we expect that to be all completed by September 15. And then from there, just Making sure that there's no congestion on the pad before we actually ship out to the launch site. We'll need about 35 days at the launch site to do the processing And to make sure that all the gases are filled and the propellants are ready to go, and then we'll get encapsulated in the fairing. And then from that point, It's a wet dress rehearsal and a launch.

Speaker 6

Well, fantastic. Well, thank you for the color.

Speaker 2

All right. Very good.

Operator

Thank you. Our next question comes from the line of Angus Sheppard with Cantor Fitzgerald. Please go ahead.

Speaker 7

Hey Steve, hey Eric, good afternoon. Congrats on the quarter and thanks for taking our questions. Wanted to just maybe clarify on the guidance withdrawn. So to be clear, does that apply to the revenue guidance, the gross margin and the cash Or is it exclusively the revenue guidance? Thank you.

Speaker 3

Yes. We're withdrawing thanks for the question, Andres. We're withdrawing guidance across the board. I mean, obviously, revenue, gross margin, those all are interrelated. And really it's just associated, as Steve said earlier, with the uncertainty around the timing of awards and significant milestones That are falling right in Q4 at year end.

Speaker 3

There's just there's 3 or 4 or 5 of them that are really material. And some of them might happen in November, December or January. And really, in terms of the health of the company and how we're doing, Any of those timings would be great, but trying to pinpoint a week or 2 here and there around year end, We felt it was not really helping you guys focus on what's important to make our business successful and that we're choosing on our vision and strategy. So we just didn't feel comfortable making guesses on those, which ultimately when you're down to a couple of weeks here and there, It's a little more than that, particularly when you're dealing with space launch in some of these cases. Obviously, we've seen that government acquisition timelines can move.

Speaker 3

We're not the 1st company to experience that. So that's really what's driving it. As we said earlier, we haven't lost anything that we previously had in our forecast. It's material to us. It's all shifted out to the right.

Speaker 3

So because of all that and all the metrics you mentioned are related. So it does apply across the board, but we try to at least orient you on the milestones that are relevant, kind of the best we know on ohms right now, the On launch date, some of the big award timings, and obviously, those are going to drive profitability in cash And top line as well, depending on how they break our way and not. Because we kind of talked about the value of the landing success payment and Things like that previously. So hopefully that sheds some light on or a little more color on our statement.

Speaker 7

Yes. Thanks, Eric. That's super helpful. I appreciate that insight. So I guess, I mean, at this time, is there any additional Visibility you might be able to give us in terms of either revenue or margins, should we be expecting positive margins By year end, I know in the past you had mentioned the positive EBITDA was a target by later this year.

Speaker 7

Any thoughts around that as to where that might stand? Thanks.

Speaker 3

Yes. I can't comment on everything. I mean, one thing we think We feel good about is if we land successfully, this year, gross margin should be, positive in the second half, Which I think is a good sign, obviously, pointing towards the future. And then we will be mitigating Our CapEx, I say mitigating, that's the wrong word, but CapEx is going to naturally come down over the second half of the year relative to the first half. And then some of our non COGS OpEx, so SG and A, that'll mitigate as well over the second as we're through some of the public company costs and other things that kind of created an increased run rate on that over the first half.

Speaker 3

So those are some of the maybe high level Thoughts in terms of directionally where we're headed in the second half.

Speaker 7

Got it. Okay. Thank you. And maybe one last one, if I may. With the upcoming lockup period Ending, right, for the rollover and for the sponsor.

Speaker 7

How do you think the market should be thinking about this increase in float Are these now shares being unlocked? Any color there? Any visibility as to what how should we be thinking about that? Thank you.

Speaker 3

You bet, Andres. Honestly, it's difficult for the company to have an opinion on that. So we'll just let the you obviously correctly stated what the timing is on that. That's public information, but we'll let the market decide.

Speaker 7

Okay. Thank you very much. I'll pass it on. Congrats again.

Speaker 3

Thank you. Thank you.

Operator

Thank you. As there are no further questions, I would now hand the conference over to Steve Altomis, Co Founder, President and Chief Executive Officer for his closing comments.

Speaker 2

Well, thank you for joining us today And I appreciate your time you spent with us. We look forward to continue our with our execution intensity and making history together in just a few short months. Thank you

Operator

very much. The conference of Intuitive Machines has now concluded. Thank you for your participation. You may now disconnect your

Earnings Conference Call
Intuitive Machines Q2 2023
00:00 / 00:00