Gatos Silver Q1 2024 Earnings Call Transcript

There are 5 speakers on the call.

Operator

Ladies and gentlemen, thank you for standing by. Welcome to Gato Silver's First Quarter 20 24 Results Conference Call. Presenting today will be Dale Andres, CEO of Gato Silver and Andrey Van Niekerk, Chief Financial Officer. We will conclude today's session with a question and answer period for other members of the Gato Silver management team will be available. Of the presentation to prevent any background noise.

Operator

Turning your attention to Slide 2, please note today's call contains forward looking statements. Various risks and uncertainties may cause actual results to vary. Gato Silver does not assume the obligation to update any forward looking statements. I would now like to turn the call over to Dale Andres. Please go ahead.

Speaker 1

Thank you, operator, and good morning, everyone. Turning to Slide 3, our strong operating performance and cash flow generation continued in the Q1 of 2024. The Los Gatos joint venture set yet another record mill throughput rate. During the quarter, we averaged a mill throughput rate of over 3,200 tonnes per day and we are well on our way to our medium term target of sustainable production at 3,500 tonnes per day. Our first quarter production puts us in a strong position for the remainder of the year and the Cerro Los Gatos production is expected in the top half of our guidance range.

Speaker 1

As a result of the strong operating performance this quarter, our all in sustaining cost metrics for the full year are expected to remain in the lower half of the guidance range despite the strengthening peso and inflationary pressures. Quattos Silver continues to receive regular cash distributions from the joint venture. Andre will talk about this in more detail, but I do want to highlight the Los Gatos joint venture's free cash flow of over CAD25 1,000,000 in the Q1 of 2024 and continuing distributions received in April of this year. Catawasilver had a cash balance of over CAD85 1,000,000 at the end of April. We are on track to update our life of mine plan in the Q3 this year and are aiming to increase throughput and also extend the mine life.

Speaker 1

Importantly, we have now started to ramp up exploration efforts on both near mine and other targets in the highly prospective Los Gatos district. Turning to Slide 4, as mentioned before, mill throughput in the quarter was over 3,200 tonnes per day with the higher throughput offset by lower silver grades as expected in the mine plan. Production was similar compared to the comparable quarter in 2023 with silver at 2,400,000 ounces and silver equivalent production, which includes zinc, lead and gold and now starting copper soon at 3,700,000 ounces for the quarter. In March, we achieved an average mill throughput rate of over 3,300 tonnes per day, which was the best monthly performance on record. With some minor modifications to the mill made this year, we believe the current mill capacity is already at the 3,500 tonne per day rate on a calendar day basis.

Speaker 1

However, to achieve these levels through the mill, we need to first show that we can sustain and then increase mining rates, which continue to be the bottleneck. We have various initiatives underway to increase those mining rates, including rebuilding the core mining fleet, other maintenance improvement projects, optimizing mine plans and schedules to support the higher rates and the major focus on operational execution including short interval control. Cost of sales for the Q1 increased by 18% compared to the comparable quarter last year, but this was primarily due to the 12% increase in tonnes processed and the 17% increase in the concentrate tonnes sold. Cost of sales were also impacted by the continued strengthening of the Mexican peso during the quarter. All in sustaining costs per payable ounce of silver and that's after byproduct credits were just over CAD10 an ounce compared to just over CAD6 an ounce in the Q1 of 2023 and that is in the lower half of our guidance range for 2024.

Speaker 1

We now expect full year production to be in the upper half of our guidance range for 2024 and I'm speaking to Slide 5 now. As you can see in the table, silver and silver equivalent production are at 27% 26% respectively compared to the midpoint of guidance and our unit cost metrics are tracking 4% below midpoint in the Q1. Based on the strong performance in the Q1, we now expect throughput rates at the Cerro Los Gatos mine to average in the top half of our 3,000 to 3,300 tonne per day guidance range in 2024 for the full year. We still expect exploration and definition drilling spend to be at CAD18 1,000,000 for 2024 and our sustaining capital expenditures to be approximately CAD45 1,000,000 and that's with the majority of that spend on underground development with the continued focus on opening up the southeast area and some of those mine equipment rebuilds and other infrastructure projects as I mentioned. I'll now turn the call over to Andre to present our financial results.

Speaker 2

Thank you, Dale. Good morning, everyone. The 70% Los Gatos joint venture's strong operating performance is underscored by yet another quarter of robust cash flow generation. Cash flow provided by operations was approximately $37,000,000 The joint venture generated free cash flow of $25,500,000 this quarter, 14% higher than the $22,300,000 in Q4 2023 and 11% lower than the $28,700,000 in Q1 2023. The drop from the comparable quarter last year was primarily due to lower realized metal prices and higher operating costs than in Q1 2023 associated largely with higher mining and processing rates.

Speaker 2

Cash flow used in investing activities was $11,800,000 in Q1 2024 and similar to the $11,400,000 in Q1 2023. Of that amount, resource development drilling totaled $3,200,000 for the quarter with most of the spending focused on the infill drilling of the Southeast Deeps. As a result of the continued strong free cash flow generation, in the Q1, the joint venture made a capital distribution of $30,000,000 in February. As a reminder, a total of $85,000,000 was distributed in 2023. Subsequent to the end of the quarter, in April, the joint venture made a further quarterly capital distribution to the partners of $25,000,000 Now turning to Slide 7 to look at the financial results of Los Gatos joint venture for the quarter.

Speaker 2

Revenue increased to $72,200,000 in the Q1 of 2024. Higher volumes of metal sold were offset by significantly lower silver, zinc and lead prices. The provisional revenue adjustment was a $900,000 negative adjustment in this quarter compared to a $13,600,000 negative adjustment in Q1 2023. Cost of sales increased by 18%, primarily due to higher mining and processing costs as a result of a 12% increase in mill throughput and a 17% increase in the tonnage of concentrate sold. Cost of sales were further impacted by the strengthening of the Mexican peso against the U.

Speaker 2

S. Dollar, which was partly offset by productivity improvement and cost reduction initiatives as part of our continuous improvement program. Depreciation, depletion and amortization expense decreased by approximately 3%, primarily due to the increase in the mineral reserves and the extension of the mine life, offset by additional DD and A on recent capital additions. The income tax expense of $4,800,000 for the quarter was 20% lower than in Q1 2023, primarily due to lower taxable income for the period. Finally, the LGJV recorded net income of approximately CAD10.2 million for the quarter, 20% lower than in Q1 2023.

Speaker 2

Moving on to Slide 8 to review the financial results for Gato Silver. Gato Silver recorded net income of $2,500,000 or $0.04 per basic and diluted share. That's up 203% from Q1 2023. Equity income in affiliates increased to $7,300,000 primarily due to a reduction in the obligation under the priority distribution agreement with Della, partly offset by lower equity income from the LGJV. Corporate G and A was approximately $1,400,000 higher than in Q1 2024 than in Q1 2023, mainly due to a $900,000 increase in non cash stock based compensation expense as a result of 20232024 equity grants and a $600,000 increase in non recurring legal fees.

Speaker 2

Turning to Slide 9. As was mentioned earlier, the joint venture paid a capital distribution of $30,000,000 to its partners, Kato Silver and Dawa, during the Q1, of which we received $21,000,000 As a result, Cato Silver ended the Q1 with a cash balance of $70,600,000 After the end of the quarter in April, the LGJV made another capital distribution of $25,000,000 of which we received $17,500,000 bringing the company's cash balance to $85,400,000 at April 30, 2024. The company, along with its insurers, has also fully funded both the U. S. And Canadian Glass Action Lawsuits, and the cash balance at the end of April is after our portion of the payments have been made.

Speaker 2

The distribution of the settlement amount is now pending final quarter approval, which we expect by the end of Q2. The LGJV ended the 1st quarter with a cash balance of $29,800,000 and had a cash balance of $20,000,000 at April 30, 2024. Both GSI and the LG JV remained debt free and the company's $50,000,000 revolver remains in place. I will now hand it back to Dale.

Speaker 1

Thanks, Andre. And turning to Slide 10, we wanted to highlight our business improvement initiatives and increased throughput are delivering results at the mine. Site operating costs per tonne have decreased by 9% over the past 3 years despite inflationary pressures, including the 5.5% per year increase in labor costs and a substantial strengthening of the Mexican peso. Our numerous continuous improvement and cost optimization programs also contribute to the lower cost per tonne. On the design side, we have successfully switched more of our mining areas from cut and fill to long hole stoping, including transfer stopes where the geometry and ground conditions are suitable, which is a more cost effective mining method.

Speaker 1

We are continuing our equipment rebuild program this year and working on our underground productivity initiatives to work towards, 1st sustainably mining at the 3200 to 3 1300 tonne per day rate, which we're currently achieving. And then to further extend that towards the 3,500 tonnes per day in the medium term. Turning to Slide 11, we are on track to provide our updated life of mine plan and mineral reserves in the Q3 of 2024 this year And the throughput and targeting the throughput rate in the plan, the current plan averages 2,950 tonnes per day and we're looking at increasing that. Even with mining more of our mineral reserves faster, we still expect an extension to the life of mine. The new life of mine plan will be based on an additional 66 kilometers of drilling that's been completed over the past 12 month period up to the end of the Q1 and we've now made that data cutoff.

Speaker 1

In the Southeast Deeps conversion drilling that we did between that April 2023 to end of March 2024 timeframe was done on 50 meter spacing targeting the higher grade trends in the zone. We still have 2 drills dedicated to further infill drilling and resource expansion on the southeast deeps. On the recovery side of things, we are completing detailed engineering for a copper separation circuit and anticipate making a decision in the Q3 of this year. We are also evaluating technology and various options for increasing the recovery of silver, gold and zinc. Turning to Slide 12, this figure shows a few of the key targets that are within a few kilometers of the existing mine workings and potentially accessible from existing underground infrastructure.

Speaker 1

Now that we have passed that database cutoff for this year's reserve update, we are excited by the opportunity to ramp up the exploration work on the rest of our 103,000 hectare land package. After the end of the quarter, we announced the appointment of Chad Uhas, our new Vice President of Exploration and Technical Services and we are really pleased to have Chad on board to guide these critical parts of our business. First up, we are starting on targets within 3 to 4 kilometers of the mine operations as it will be easiest to bring anything we find here into production. We do have 2 rigs working now towards the southeast of the mine in the Puerto Gueno area and the first holes stepped along the Gatos fault and are now stepping south along the Dragon Fault towards the Thule and Roja Fault targets. A third greenfields rig will be moving on to the Northwest Deeps target and Central Deeps target from and that's and then further out from the Cerro Los Gatos mine in the basin within the next few weeks.

Speaker 1

We will be getting the drill rigs further out from Cerro Los Gatos in the surrounding mine later in the year with some very prospective targets in the San Luis area about 5 kilometers northwest of the mine and a number of targets in the Linz area about 20 kilometers to the northwest. On Slide 13 and in summary, we continue to safely drive mill throughput increases together with productivity improvements and cost optimization, which is a core part of our business and operating strategy. We remain focused on developing a new life of mine plan by the Q3 of this year, which incorporates the Southeast Deeps conversion drilling together with other value enhancing initiatives, including higher throughput rates and the copper circuit. We continue to be very excited as we start to increase our near mine and district drilling in the large and highly prospective district, including Puerto Gueno and the Northwest and Central Deeps which I discussed. And importantly, we continue to generate strong operating margins and cash flow with regular distributions expected from the Los Gatos joint venture and a growing cash balance.

Speaker 1

I will now hand it back to the operator for questions.

Operator

At this time, I would like to remind everyone in order to ask a question, press star then the number 1 on your telephone keypad. And your first question comes from the line of Cosmos Chiu with CIBC.

Speaker 3

Hi. Thanks, Dale and Andrea and team. As I read, certainly a lot of exploration upside here. But my question is on Southeast Deeps, I guess. I was reading up on it.

Speaker 3

And as you mentioned in your press release from early April that silver grade decreases with higher byproduct credits when you look at Southeast Deeps versus Central, the Central Zone and the Northwest Zones. So right now your reserve grade is sitting at about 217 gram per tonne. What can we expect to the extent that you can kind of describe it? What can we expect as we come through and with your life of mine plan that's getting updated in Q3?

Speaker 1

Yes, thanks for the question. Hi Dale. And yes, I'm going to ask Tony to provide some color on that. But I will say we're right in the process of doing the resource modeling work and incorporating those drill results in the Southeast Deeps. And so I don't think there's a lot we can say on a specific grade target.

Speaker 1

But Toni, do you want to comment further, please?

Speaker 4

Hi, Cosmos. I'm probably going Thanks for the question. I'll probably just echo what Dale said. Like, I mean, we've really just kicked it off. So like we can't come in until we've actually done the work and there's a lot of things that go into that in terms of where we end up on scope design, where we like how much dilution gets out of it.

Speaker 4

There's a whole bunch of stuff. I can really just sort of recommend you go have a look at those. And I'm sure you have the expiration press releases that we put out. I mean, what you can see from that and we report those effectively sort of similar cut off to what we use for the reserve work. So what you'll see from

Speaker 2

that is that it's

Speaker 4

higher base metals. There's a lot of good zinc and lead and particularly copper in those, but the silver is lower. And so I mean, all I can do to guide you is to have a look at those, but we can't sort of commit to final numbers until we've actually done all the work.

Speaker 3

Of course. And maybe ask a different way, Tony and Dale, I see that your resource grade right now is $100 per tonne. Could you remind us is a lot of that resource from Southeast Deeps?

Speaker 2

Yes. A lot of the Okay.

Speaker 3

So that's what you're trying to convert?

Speaker 1

Yes. And Tony, you can expand on this, but let's say we're trying to convert, I think it's just over 4,500,000 tonnes or 4,600,000 tonnes if I recall correctly, Tony can correct me, of inferred resource in the Southeast Deeps. And we're trying to convert the highest grade portions of that obviously. But as Tony mentioned, the silver grades are expected to be lower than reserve grades based on the results that we have. But base metals are holding in very nicely and the copper is a key differentiator for that zone as well.

Speaker 3

And Dale and Tony, when we've talked about this in the past, in the past when you talked about the updated life of mine plans last year and this year as well, There's always a dual track in terms of targeting both, number 1, the replacement of mine life and also number 2, sort of to maintain hopefully reserve grade. Is that still kind of like the target in the background in terms of what you're trying to do with each and every one of these life of mine plans?

Speaker 1

Yes. I'd say we're trying to do this time around, it would be 3 things. 1, and I mentioned it in the script, was to increase continue to increase throughput rates and we are driving towards that 3,500 tonnes per day. We'll have to see as we go through the mine planning work whether we can sustain that and how we incorporate those higher throughput rates into our new life of mine plan. But that's clearly a target for us.

Speaker 1

We do plan to extend the mine life. And just as we do higher throughput rates, we are taking and able to continue to lower taking able to take lower grades and we're continuing to lower our unit cost and that's just operating efficiencies operating well above 3,000 tonnes per day. And just as a reminder, our previous life of mine averaged 2,009 50 tonnes per day and we do plan to extend the mine life including those higher throughput rates. And then as I said, we'll make a decision on the copper circuit and that's again a margin enhancement that we're looking to bake into the new life of mine plan as well. But we're just currently going through all of that work.

Speaker 3

Great. Thank you. And maybe as a follow-up and broader scale as well. Dale, as you mentioned, great looking balance sheet these days. You're getting cash sweep from the joint venture and $85,000,000 in cash, no debt, and you're only spending about $18,000,000 in exploration.

Speaker 3

So what's next as you continue to grow the company? Is everything really organic, internal? Or you're looking externally as well? Can you maybe talk about the growth plans with the new exploration team now in place, new VP exploration, are you increasing potentially increasing exploration budget? So again, internal, external, how are you going to continue to grow the company and can we see exploration budget increase?

Speaker 1

Yes. Thanks for highlighting that Cosmos, including the cash balance. We're sitting on over 85 $1,000,000 as you pointed out. And if you take our share of the joint venture cash, which was $20,000,000 at the end of April, the combination of that is over CAD100 1,000,000. Just to be clear that CAD85 1,000,000 and all the distributions made from the joint venture is after our exploration expenditures and we do have plans for CAD18 1,000,000 this year and that is a ramp up from what we did last year.

Speaker 1

There is only so much we can do from an exploration perspective to execute that and maybe Tony you can comment or provide some additional color. Right now we're working towards that $18,000,000 budget, about half of that on resource conversion and extension and half more on what I would call pure greenfields exploration even though some of that is near mine. If we tag into something really interesting, trust me, Cosmos, we will put the dollars and bills to work on that. But it's important to make sure that we're we have a plethora of targets and we need to make sure that we're properly prioritizing those doing the work to make sure we're attacking the best areas first. And there's still lots of work to do.

Speaker 1

We've done a lot of foundational work over the But yes, just we do need to be a bit careful about just ramping up. It's such a big property. We're going to be here for many years. Tony, I don't know if you want to expand on that.

Speaker 2

I mean, I think you captured it

Speaker 4

there pretty well, Dale. I mean, realistically, look, we want to make sure that we're doing good exploration and that we're sort of modifying the program on the results that we get. So we don't want to just go out and drill a massive program and not be following it properly. So we are going to do it sensibly and do it within the sort of capacity that we have like to actually make sure that we're doing the right work. So I think, I mean, we are ramping it up, but I think that this is a level where we can make sure that we're doing good sensible exploration.

Speaker 1

And then maybe just to pick up on the other part of your question, Cosmos, and we will look at, opportunistically, other opportunities.

Speaker 2

We're not

Speaker 1

going to comment about anything specifically, but we are looking to grow the company. We don't need to do anything beyond our current district, but we will look at things opportunistically as well. We have a great balance sheet as you pointed out.

Speaker 3

Great. Thanks, Dale, Tony and Andre. Those are the questions I have. Thank you.

Operator

There are no further questions at this time. Mr. Andres, I turn the call back over to you.

Speaker 1

Thank you, operator, and thanks to everyone participating in the call. We look forward to updating you as the year progresses. Thanks again.

Operator

This concludes today's conference call. You may now disconnect.

Earnings Conference Call
Gatos Silver Q1 2024
00:00 / 00:00