NYSEAMERICAN:EQX Equinox Gold Q2 2024 Earnings Report $6.72 +0.16 (+2.44%) Closing price 05/23/2025 04:10 PM EasternExtended Trading$6.69 -0.03 (-0.43%) As of 05/23/2025 07:59 PM Eastern Extended trading is trading that happens on electronic markets outside of regular trading hours. This is a fair market value extended hours price provided by Polygon.io. Learn more. ProfileEarnings HistoryForecast Equinox Gold EPS ResultsActual EPS-$0.01Consensus EPS -$0.01Beat/MissMet ExpectationsOne Year Ago EPSN/AEquinox Gold Revenue ResultsActual Revenue$269.43 millionExpected RevenueN/ABeat/MissN/AYoY Revenue GrowthN/AEquinox Gold Announcement DetailsQuarterQ2 2024Date8/7/2024TimeAfter Market ClosesConference Call DateThursday, August 8, 2024Conference Call Time10:30AM ETUpcoming EarningsEquinox Gold's Q2 2025 earnings is scheduled for Wednesday, August 6, 2025, with a conference call scheduled on Thursday, August 7, 2025 at 10:30 AM ET. Check back for transcripts, audio, and key financial metrics as they become available.Conference Call ResourcesConference Call AudioConference Call TranscriptSlide DeckInterim ReportEarnings HistoryCompany ProfileSlide DeckFull Screen Slide DeckPowered by Equinox Gold Q2 2024 Earnings Call TranscriptProvided by QuartrAugust 8, 2024 ShareLink copied to clipboard.There are 7 speakers on the call. Operator00:00:00Thank you for standing by. This is the conference operator. Welcome to the Equinox Gold Second Quarter 2024 Results and Corporate Update. As a reminder, all participants are in listen only mode and the conference is being recorded. After the presentation, there will be an opportunity to ask questions. Operator00:00:39I would now like to turn the conference over to Rylin Bailey, Vice President, Investor Relations for Equinox Gold. Please go ahead. Speaker 100:00:49Thank you, Gaylene, and thank you everybody for joining us today for our Q2 call. Peter and I are dialing in from beautiful Princeton, BC because we are 2 days into the ride to Greenstone. So this is a big not cross Canada, I guess cross half of Canada. We are riding from Vancouver to our new mine in Geraldton, Ontario to celebrate the mine opening, but also to raise money for the Geraldton District Hospital, which is the hospital that serves the Greenstone Mine workforce and also 5 indigenous communities and about almost a 3000 Square Kilometre region in Ontario. So it's going really well so far. Speaker 100:01:22It's super exciting. We've got people from our mine sites in Brazil and the States and in Mexico that have flown up to Canada to join us for the ride. And we're making our way across the country, raising money for the hospital. Like I said, we've raised almost $1,200,000 so far, thanks to the generosity of our vendors and some industry sponsors. We're also raising money for 4 schools and a hospital in Brazil and for the Alzheimer's Association of California. Speaker 100:01:47So if you're interested in more information about that, you can go to the Ride to Greenstone website or the Equinox Gold website, and please do follow the progress as our cyclists make their way across the country. After that plug, we'll now turn it over to the conference call, so we will, of course, be making a number forward looking statements today. Please do visit our website, SEDAR and EDGAR to learn more about the company. And I'll turn the call over now to our President and CEO, Greg Smith. Speaker 200:02:14Thanks, Rylin. Good morning and thanks everyone for joining the call today. On the line with me is our COO, Doug Reddy our CFO, Peter Hardy and our EVP of Exploration, Scott Heffernan and of course, our VP of Investor Relations, who you just heard from, Rylin Bailey. Today, we are discussing Equinox Gold's 2024 Second Quarter Financial and Operating Results. I'll start with a broad overview of the quarter, and then I'll turn over the call to Pete and Doug for more details. Speaker 200:02:44I'm going to start with safety. We did unfortunately have a fatality at our Fazenda mine in Brazil in June. This is a tragedy for all of us at Equinox and we extend our deepest sympathies to our employees and also the family, friends and co workers. We did have a site wide suspension of operations at Pazenda in June to facilitate both the investigation and also to refresh our site safety training. On the environment side, we did have no significant environmental incidents during the Q2. Speaker 200:03:21And as previously reported, we published our fiscal 2023 ESG report in May during the quarter and you can find the report on the Equinox Gold website. Before the quarter, we produced just over 122,000 ounces of gold and sold just over 115,000 ounces at a cash cost per ounce sold of $17.47 and an all in sustaining cost per ounce sold of $2,041 per ounce. For the 1st 6 months of the year, we produced approximately 234,000 ounces and sold approximately 232,000 ounces at cash cost of $16.53 per ounce and all in sustaining cost of $19.93 per ounce. We did have a few developments during the quarter that affected our production and costs in Q2 and also drove an update to our fiscal 2024 guidance. In mid May, we completed the acquisition of the 40% of our Greenstone mine that we didn't already own. Speaker 200:04:19We spoke about this on the Q1 call and in a couple of press releases, but as a reminder, this transaction delivers full ownership of the Greenstone mine to Equinox Gold and consolidates ownership of Greenstone, which is one of the largest and highest grade open pit gold mines of scale in Canada. This transaction is accretive to our cash flow and our EBITDA. It delivers substantial near term value and it increases the company's average mine life reserves production, all while lowering our consolidated per ounce operating costs. Greenstone has been ramping up largely on plan with our first gold pour in late May and just over 16,000 ounces produced through the end of June. Production has continued to ramp up with just under 20,000 ounces produced in July alone at Greenstone. Speaker 200:05:05We recently concluded a multi day shutdown to address various wear and process issues identified through the startup and are now pushing toward achieving commercial production by the end of Q3. With the ramp up progressing well, we've maintained our guidance Greenstone with an increase to reflect the consolidation of ownership. We previously reported in April that we experienced some geotechnical issues in south wall of the Piava open pit at Aurizona and that we had temporarily suspended mining in Piava. We continue to process stockpiled ore through April and production in Q2 at Aurizona primarily reflects processing of this material. We then idled the mill in May June and accelerated mining in the new Tatajuba open pit. Speaker 200:05:50We did begin processing first ore from Tatajuba in early July. We are working on mitigation activities to recommence mining in Piaba and this is progressing well. As the timing of starting mining again in Piaba does remain uncertain, guidance Aurizona has been reduced to take into account lost production during the suspension of processing in May June and also to reflect the lower grade ore mined primarily from Tatajuba through the remainder of the year. At Mesquite, 2024 is primarily a stripping year as we pre strip the Ginger pit, which supplies ore to the mine or to the heap in 2025. Mining at Mesquite has been performing well with recoverable ounce stacked exceeding plan. Speaker 200:06:34However, we are seeing slower than expected recoveries off the heap leach pad from ore stacked in prior periods in part due to the increasing pad height. We are working to accelerate production, but we have reduced our 2024 production guidance for Mesquite to account for the slower recoveries. Finally, the company has concluded its previously reported assessment of the Phase 1 operations at Castle Mountain and we've We will continue to focus We will continue to focus on advancing permitting and engineering of the Phase 2 expansion at Castle. Our guidance has been updated to reflect this change at Castle Mountain and Castle will be reported as a development project going forward. Of course, we will continue to recover ounces off the pad through the year and into next year. Speaker 200:07:24With these changes reflected, consolidated guidance for 2024 has been updated from 660,000 to 750,000 ounces of gold to $655,000 to $750,000 ounces of gold with cost updated to cash costs of $13.05 to $14.05 per ounce and all in sustaining costs of $16.35 to $17.35 per ounce. This continues to reflect a substantial increase in gold production at much lower costs over the second half of the year. With that, I'll turn it over to Pete to discuss our financial results. Speaker 300:08:00Thanks, Greg. Speaker 400:08:02We're now on Slide 7 in the presentation. During Q2, we sold 115,000 ounces of gold at a realized price of $2,328 per ounce for revenues of $269,000,000 Total sales included 10,000 ounces sold by Greenstone. Income from mine operations was $27,000,000 We had $199,000,000 in operating expenses in Q2 'twenty four compared to $193,000,000 in Q2 2023. Operating expense in Q2 2024 increased 3% compared to Q2 2023, primarily due to the contribution of operating expense at Greenstone, which was a construction project in 2023 and did not have operating expenses and a higher operating expense at Los Filos, which was driven by an increase in the in underground mining activity, offset by lower operating expense at Aurizona that Greg mentioned earlier. On a per unit basis, we had a higher than usual Q2 twenty twenty four cash cost of $17.47 an ounce. Speaker 400:09:03The increase over previous quarters is primarily volume driven with the lower production at Aurizona due to the geotechnical issue at the Piava pit. The same explanation applies to our higher than usual all in sustaining cost per ounce for the quarter. Note that Greenstone is not yet in commercial production, so when you're looking at our cost metrics, the 10,000 ounces if sold along with the related cost of production are excluded from the calculation of cash cost and all in sustaining cost metrics we reported in Q2. That said, the revenues and related operating cost are still reported in the income statement as required by IFRS. Our EBITDA in Q2 2024 was 510,000,000 Included in EBITDA is a fair value gain on remeasurement of our Greenstone ownership interest that recorded when moving from proportionate to full consolidation. Speaker 400:09:56For accounting purposes, we record the changes if you sold the 60% ownership interest we had at fair value. The gain results from the difference in fair value and the cost that the 60% interest was carried at, and that gain is about 470,000,000 dollars Our adjusted EBITDA of $51,000,000 for Q2 is the same as Q1 2024 and down $19,000,000 from Q2 2023's adjusted EBITDA of $71,000,000 The decrease in adjusted EBITDA in Q2 2024 compared to Q2 2023 was primarily due to the impact of an $8,800,000 realized loss on gold contracts in Q2 twenty twenty four. We didn't have any in Q2 2023. In addition, we had a small realized loss on foreign exchange contracts this quarter, whereas in Q2 2023, we had a $9,100,000 realized gain on the same. We had net income of 2 0 $4,000,000 for basic earnings per share of $0.72 $0.61 a share fully diluted. Speaker 400:10:54On an adjusted basis, we had a net loss of $6,000,000 or $0.01 per share. Cash flow from operations before changes in non cash working capital was $45,000,000 or $0.12 a share. With respect to our sustaining spend for Q2, we spent $31,000,000 which is pretty much in line with what we did in Q1 this year. With regards to Greenstone, with the mine and plant ramping up, Greenstone should now fund itself from a cash flow perspective. For Greenstone, on a 100% basis, a total of 1 point $37,000,000,000 project to date has been spent on construction and commissioning. Speaker 400:11:28Equinox's share of that spend was $55,000,000 during the quarter, $109,000,000 year to date and $834,000,000 project to date, which excludes capitalized interest and other non cash amounts capitalized. Had a busy quarter for corporate financing activity. To fund the $955,000,000 we needed to acquire the remaining ownership of Greenstone, amended our existing senior revolving credit facility to arrange a $500,000,000 term loan, completed a bought deal equity financing for gross proceeds of $299,000,000 we issued 42,000,000 shares directly to Orion Finance and issued a $40,000,000 promissory note to Orion Mine Finance that matures in December 2024. Under the terms of the $299,000,000 bought deal equity financing, the company issued 56,400,000 shares at $5.30 per share. The $500,000,000 term loan matures May 13, 2027. Speaker 400:12:23No principal repayments are required under the term loan for the 1st 2 years of the 3 year term. Quarterly repayments will commence on August 13, 2026, equal to 10% of the then outstanding principal amount, with the remaining outstanding principal payable at maturity. The company may repay any portion of the outstanding term loan at any time without penalty. Interest, covenants and other terms are substantially consistent with the company's existing revolving credit facility and the term loan benefits from the same security package as the revolving credit facility. During Q2, we also amended 2 of the convertible notes by extending their maturities by 6 months. Speaker 400:13:05The maturity date of the 2019 convertible notes was extended from April 12 of this year to October 12, and the maturity date of the 2020 convertible notes was extended from March 10, 2025 to September 10, 2025. In addition, the conversion price of the 2020 convertible notes was amended from $7.80 per share to $6.50 per share. For the $500,000,000 term loan, the company was required to have in place 328,000 ounces of gold hedges of our forward gold production through mid-twenty 26. The company elect and we already had some of those gold hedges in place for the second half of this year that we added to. The company elected to wait the hedges into the next 12 months using gold collars. Speaker 400:13:52The collars are arranged as follows. For the second half of twenty twenty four, there are 188,000 ounces hedged with a floor of 2,150 and a ceiling of 2,738 per ounce. For the first half of twenty twenty five, there's 100,000 ounces hedged with a floor of $2,189 and a ceiling of $2,905 an ounce. And for the second half of twenty twenty five, 20,000 ounces with a floor of 2,100 and a ceiling of 3,487 per ounce. And finally, for the first half of twenty twenty six, also 20,000 ounces with a floor of 2,100 an ounce and a ceiling of 3,487 per ounce. Speaker 400:14:32Just with respect to those convertible notes, extending the notes, the maturity of those 2 convertible notes significantly enhances our financial flexibility as we advance commissioning of our world class Greenstone Gold Mine, which remains on track to pour gold this quarter. Moving to Slide 8. With respect to our available liquidity at June 30, we had $160,000,000 of unrestricted cash on hand and $105,000,000 available to draw on a revolving credit facility. The first of our debt maturities comes in October with $140,000,000 2019 convertible note I just mentioned. It has a conversion price of $5.25 per share. Speaker 400:15:09Should the note holders decide not to convert, the company will repay the note using its existing cash and liquidity. Moving to Slide 9. With Greenstone construction complete and commercial production on the near horizon, the financial focus switches to deleveraging. Free cash flow produced by the mines will be used to pay down debt. For the 1st few years at Equinox Gold, we've acquiring and building mines and have been using debt as one of the funding methods for doing so, including an additional $500,000,000 term loan to consolidate our Greenstone ownership. Speaker 400:15:42This slide demonstrates Equinox Gold's historical leverage as measured by net debt to EBITDA ratio from Q1 2020 through Q4 2023 and pro form a leverage through 2026 as per analyst consensus. The general trend we see is that leverage in the company increased as acquisitions were completed and mines were being built. This is a natural consequence of using debt as one lever for funding acquisitions and construction. Leverage peaked in Q1 2020, a few months after construction of Aurizona was completed and again in late 2022 as construction of Greenstone was ongoing and construction of the Santa Luz mine was completed. Another trend we see in this chart is that as the mines are commissioned and ramped up, that leverage decreases as Equinox Gold has a benefit of EBITDA and cash flow generated by the new mines. Speaker 400:16:26And we expect the same as Greenstone enters into commercial production hopefully later this quarter. With that, I turn the presentation over to Doug for a review of the operations. Speaker 500:16:36Thanks, Pete. We're now on Slide 11 of the presentation. At the Mesquite mine, gold production was 17,607 ounces with an all in sustaining cost of $12.83 per ounce. Waste stripping continued in the Ginger pit and the majority of the ore from that pit goes to leach pad starting in Q1 of 2025. For the rest of 2024, production is mostly drawdown of the leach pad inventory side slope leaching and leaching of additional ore coming from current mining and rehandling and re leaching of the old Vista pad material. Speaker 500:17:13The recoveries from the leach pad have been slower than expected due to pad height and associated longer leach cycles. At Castle Mountain, production was up over Q1 at 6,148 ounces at an all in sustaining cost of 14 $24 per ounce. Phase 1 is a small operation that is mining and processing low grade historic backfill material that needs to be removed from the old open pits prior to mining in situ material in Phase 2. We completed a review of the mine plan and costs at Castle Mountain for Phase 1 and concluded that mining will be suspended in August for the duration of the Phase 2 permitting. Residual leaching will continue through 2024 And we continue with the Phase 2 permitting process. Speaker 500:18:07At Los Filos, production increased during Q2 to 37,000 430 ounces and this should continue to improve in H2. The all in sustaining cost was $2,274 per ounce. During the quarter, the crusher was brought back online and all the material for crushing that had accumulated while the relocation of the conveyor was underway was then crushed and is now under leach. The productivity program that's been in place at Los Filos for the last 2 years continues to show improvement and we saw an increase in Los Filos underground mine production started development work in the quarter. Our dialogue with our community partners continues. Speaker 500:19:04Continue to work towards establishing new agreements so that we can ensure long term economic viability and stability for the mine. If we move on to the next page. In Brazil, at the Aurizona mine, production was 6,309 ounces with a very high all in sustaining cost over $3,000 per ounce. This reflects the standby costs that being incurred while the plant was idle and the low ounces produced in the quarter, which resulted in a high cash cost. As previously announced and mentioned earlier in this call, we suspended mining in the Piavo pit in April after geotechnical instability led to the displacement of material in 2 locations in the south wall of the Piaba pit. Speaker 500:19:54We accelerated the startup of Tatajuba open pit and after 2 months with no ore processing, we restarted the process plant at the beginning of July. We continue working on remediation planning and activities in the Piaba open pit with safety being the priority. Work at the moment on Piaba includes recontouring of the pit wall that will happen in 2 areas. We are drilling a series of dewatering holes and we've been installing additional monitoring equipment and completing external reviews of geotechnical and hydrogeological information. At the Fazenda mine, regrettably, we had a fatality in the underground portion of the mine as discussed earlier in the call. Speaker 500:20:42Production at Fazenda was 14,178 ounces and the all in sustaining cost was $18.76 per ounce for the quarter. Plant feed is currently 35% from open pit, 65% from underground and recovery is at 91%. Currently mining is approximately fifty-fifty open pit and underground. The open pit contractor is now fully mobilized at catching up on the mine plan through the rest of the year. In the underground mine, we are mobilizing additional equipment to facilitate a catch up on development so that we can access additional stopes in Q3 and Q4. Speaker 500:21:25At RDM, gold production was 10,675 ounces and the all in sustaining cost was $17.74 per ounce. We changed the rental mining fleet and are catching up on the mining in H2. Construction of the dry stack tailings area is complete and is now fully in operation with cyclone tailings being dried and placed in the storage area. At Santeluz, production was up compared to Q1 at 13,627 ounces and an all in sustaining cost was $2,399 per ounce. Recovery was below plan at 60% for Q2. Speaker 500:22:10Dilution efficiency and electro winning modifications were completed in the quarter. SAG mill liners and a new trunnion were installed. The new trunnion enables has enabled throughput to be increased by about 10%. And a new desliming circuit was added. The desliming circuit is intended to remove a portion of the total organic carbon and improve overall recovery by about 6%. Speaker 500:22:35The circuit was brought online and is in commissioning through Q3. The objective is to achieve recoveries around 73% or higher for the second half of the year. Moving on to Page 13. At Greenstone, first ore was introduced to the high pressure grinding rolls and grinding circuits on April 6. The first gold pour was on May 22 and the mine poured produced 16,247 ounces in Q2. Speaker 500:23:06Milling throughput achieved a rolling 30 day average of 59% of the nameplate of 27,000 tonnes per day as of July 22. And then as we came to the end of the month, we had our planned shutdown, major shutdown, and we were up and running back on schedule after that shutdown was completed. Overall, the ramp up is going very well. We mined over 7,000,000 tons in the quarter with over 1,200,000 tons of that being ore. Stockpile was 2,000,000 tons at the end of the quarter. Speaker 500:23:40The fleet now has 25 haul trucks and 4 shovels, and we look forward to commercial production during Q3. So with that, I'm going to hand it back to Greg. Speaker 200:23:52Thanks, Doug. Yes, it's been a mixed quarter for us. We've had to work through some challenges at a few of our mines and particularly at Aurizona and we've had to make some revisions to our guidance as a result, but also a very positive quarter for the company in that we were able to complete the acquisition of the rest of Greenstone, achieve first gold pour and then start the ramp up toward commercial production. And really we're at an inflection point now. We expect a stronger second half from a number of our mines, but more importantly, Greenstone is ramping up to commercial production over the next few months and we already produced more gold at Greenstone in July than we did in all of Q2. Speaker 200:24:32So the big picture here is we are significantly increasing our production at lower cost during a period of historically strong gold prices and what we think is a continuing bullish macro outlook for gold. And I think I'll wrap it up there and turn it over to Rylin to start Speaker 400:24:50the Q and A. Speaker 100:24:50Thanks, Greg and Doug. Gaylene, can you please ask remind our participants how to ask a question? Speaker 600:24:56Certainly. Operator00:25:19Box in the lower left corner of the webcast frame. We'll pause for a moment as callers join the queue. Speaker 100:25:28So I do have a few questions from online. So one that came in first, we will ask first. How are you going to catch up in the second half of the year to achieve your guidance? Speaker 200:25:38Sure, I can take that. I mean, the main plan here, Rillin, as you can see from the guidance, is that most of our sites will have a stronger second half of the year, in particularly Los Filos and of course Greenstone as we ramp up to commercial production. Greenstone is a very large mine and production of Greenstone definitely moves the needle for us. So, yes, the second half of the year will produce a lot more gold than we did in the first half. Speaker 100:26:04Okay. Mike Parkin sent me a question. He is our analyst from National Bank, sent me a question by email. This is for Peter. What will Capital Mountain Care maintenance cost be on an annual basis? Speaker 100:26:14Will there be any severance payments? And if so, how much and when will those flow through the financials? Speaker 400:26:22Thanks Mike. I'll start with the later part. Yes, there will be severance payments. We haven't updated the market provided guidance on what care and maintenance will look like heading into next year and beyond. And we'll do so when we update guidance or perhaps earlier than that. Speaker 400:26:45With respect to the remainder of the year, we'll be residual leaching. So the guidance that we provided for Castle Mountain effectively takes us through the point at which we go on to residual leach, which will be sometime during Q3. We expect to continue to pull ounces from the pad for several months after. And we'll provide a more comprehensive update on those costs as we move forward. It will depend in part on when the residual leach tapers off and when it no longer is beneficial to continue to residual leach based on the ounces being pulled and the cost to do it. Speaker 100:27:29Okay. Thank you, Peter. A question from Speaker 500:27:33I'll just add to that, that at Castle Mountain, our mining and our crushing is contractors. So those contract terminations have been provided to the contractors. And we have a very small team overall who will continue to work on the residual leaching. So it is quite a compact and small operation or remains a small team as we move into residual leach. Speaker 400:28:00Thanks, Doug. Speaker 100:28:01Thank you. A question from our Carrie Smith, our analyst at Haywood Securities, who is currently on an airplane. When do you expect to be able to get back into mining at Payaba? And how many tons of ore or ounces of production do you have at Tatajuba? Speaker 500:28:16So for return to mining in Piaba, we're doing work in Piaba now, but it's at the upper areas of the pit. We will, during the course of this year, be going in and mining certain areas, especially on the west end of Piaba from pit. Overall plan is based on doing all the dewatering program and all the geotechnical and recontouring activities. We would like to be doing some additional Piaba pit by the end of this year, but the real focus is going to be doing a large program in 2025. But again, it all is dependent on working through all of our activities that we're doing to remediate and make the bit totally safe, keep the regulators totally informed and being able to move in and be able to mine especially on the east end of the pit. Speaker 100:29:18Thank you, Doug. Operator, can we please take some questions from the phone? Operator00:29:23Certainly. The first question from the phone line is from Anubha Soni with CIBC World Markets. Please go ahead. Speaker 600:29:30Hi, good morning, everyone. First question, I think I'm going to focus on Greenstone. When we look at the throughput rates that you delivered this quarter, can you just give us a little idea of how that ramped up over the course of the quarter and what the exit rates are right now in throughput? Speaker 500:29:52So April, May, we were 40%, 50% of rated throughput, came up to just under 60% as we came into July. Then we had a major shut. So we've taken care of a lot of the items that we've noticed during the ramp up and we'll continue we've restarted and continue with the ramp up in August. I'm sure I'm not sure exactly the other details that you're looking for. Speaker 600:30:24No, that's good. Another question in terms of the definition of commercial production. I noticed it said within 10% of the design grades. You guys are substantially over the design grades. And I have a second question related to that in a second. Speaker 600:30:41But the does that mean that you when you're looking for commercial production, you're looking for it to come down to the sort of 1.5 that you were expecting over the next, I guess, 3, 4 years rather than the 2.5 that you delivered this quarter? Speaker 500:30:54Yes. It won't continue at the 2.5. I mean, that was essentially, as you'll be aware, putting a lot of ounces that go into the circuit. And that was done where we the ability to feed some high grade material and be able to add that into the mill. And going forward, it gets tempered down to more the targeted production overall production rate. Speaker 500:31:20So it won't continue at 2.5. That would be glorious, but we can't do that forever. Speaker 600:31:26It was a good surprise. I was but I didn't hold my breath that it sustained. Speaker 500:31:33Yes, I anticipated that somebody would do the calc and say, how come your ounces produced and you have 88% recovery. But if you look at the number of ounces that go into circuit, then it all makes sense. And by putting in the higher grade, we took care of building up the ounces in circuit very quickly. Speaker 600:31:51Okay. And then as we get to the so doing some calculations on the mining and the ore stockpile rates, I think can you talk about the truck availability? I think you're getting around 2,000,000 tonnes per truck, if I did the math right on that per annum, if you annualize it. And are design rates on those trucks more like could you just tell me what the design rates on the trucks are? I thought they were somewhere around 3%, 3.5%, but of course that depends on your haul distances. Speaker 600:32:22So can you just talk about the availability on the trucks? Yes. Speaker 500:32:26Haul distances are affected at this very start for a couple of reasons. One that, while we've been pioneering essentially the pit, we've been moving a lot of the soil material, some of which needs to be treated. So that means we have to take it down to an area where it can be dealt with. That consumes some of the cycle time. We've also been doing a lot of work taking clean waste down to our tailings facility, again, longer cycle time for those trucks. Speaker 500:32:58So you can't really you'd have to separate them out between mine and those other activities. But essentially with a fleet of 25 trucks, 4 shovels on-site, we'll be continuing the ramp up towards a capacity of 180,000 tonnes a day by Speaker 200:33:17the end of the year. Anita, it's Greg here. I might just add. I don't know if there's a recent picture on our website, but if there's not, I can send one to you. The first this 1st year of mining at Greenstone is a little bit complex a couple of reasons. Speaker 200:33:32And you'll remember when we were there, there's the old McLeod tailings that are there from previous mining. Part of our permit requires that we excavate those tailings and move them to our facility and we do have some trucks dedicated to doing that. We also have this, we call it Type D soil, which is contaminated soil in the main open pit, which is a delicate job to move that material. And we're in the process of doing that. And as we do that, it opens up additional areas of that open pit for us to mine. Speaker 200:34:00So if you looked at a recent picture, what you'll see there is sort of a couple of awkward islands in the middle of our pit where we're still excavating the Type D soil. And it does provide some complexity in mining efficiency in these sort of the first half of this year. We're working through that quickly and I think over the next quarter or so largely through the Type D soil, we opened up the pit, The cloud tailings are well advanced and we start to really see those efficiencies as we go into Q4 here. So it's just for the 1st year, as Doug said, pioneering this pit with some of the historic issues does make it a little more complex. But again, we've been able to build a large stockpile, feed the mill and are on track to be able to meet our targets. Speaker 600:34:40Okay. And then just a last question on that, on the mining rates. I think they meant you guys mentioned that some of it was dedicate, while looking back at the last couple of quarters. But basically, it was talking about how the mining rates, some of that was dedicated to providing waste rock for the tailings dam. Are you through that? Speaker 600:34:57Is it now are you basically just using the fleet to do ore and waste in the pit? Or are you still looking at helping out the tailings facility? Speaker 500:35:06No, we're still hauling clean waste down to the TMF. Speaker 600:35:12Okay. And how much It's Speaker 500:35:13on the next stage. Speaker 600:35:17Right. So how much material like in terms of millions of tons do you have to deliver to the waste rock to the tailings facilities this year? Speaker 500:35:28I'll get back to you shortly. Don't have that number on the top of my tongue, but I'll get back to you shortly. Speaker 600:35:34You don't have that memorized, Zach? Okay. That's it for my questions. I'll get back in the queue. Speaker 200:35:39Thanks, Elias. Thanks. Operator00:35:44The next question is from Wayne Lam with RBC Capital Markets. Please go ahead. Speaker 300:35:51Yes, thanks guys. I guess maybe just circling back to Greenstone, really nice to see you guys hit the 2,000,000 ton ore stockpile as planned. Could you give us a grade of the an idea of the grade of that stockpile? And then maybe just as a follow-up on the 2.5 gram tonne, Typically, we see much lower grade feed put through the early stages in ramping of the mill. But just wondering if you guys are seeing any positive reconciliation versus plan? Speaker 300:36:23And was some of the higher grade material put through the mill to accelerate some upfront cash flow? Speaker 200:36:31Wayne, it's Greg here. I'll start with the high grade into the plant and then Doug can respond to some of your other questions here. As we were ramping up, basically in the first couple of benches of or the first mining we did, we did have a fair bit of high grade ore. And as we started to ramp up the mill, we started to have very good recoveries right off the bat. So we're seeing plus 90% recoveries pretty much right away. Speaker 200:36:57In part that's because of the increased residence time in the tanks when you're not up to full capacity, but when you start one of these plants up, you've got to build up that inventory in the tanks and then you have the sort of rolling gold inventory in your tanks. Because we had access to such high grade material and we were getting the very high recoveries right out of the gate, We took that opportunity to feed in some high grade ore and ramp up that inventory quickly, which got us into producing gold more quickly than we otherwise would have. It wasn't a cash flow decision. It was more of a commissioning decision. And frankly, it was we had some very high grades that were coming out. Speaker 200:37:38Our stock Doug will get into it, but we've got different bins for stockpile. And we had a couple of days there where we were feeding, I think, 5 grams per tonne and material like that. So we were able to do that and as part of our commissioning and it reflects in the grade over the Q2. As Doug said to Anita, that's not something that's going to persist, but it was helpful as we were ramping up the plant. Speaker 500:38:04Yes. So the I think the other question was just about the stockpile where we're partly feeding from stockpile, but we're also doing some direct feed to the crusher as well. So it's not all first in, first out by any means. And reconciliation overall has been quite good. So average grade, I'd have to look it up because we have been focused on certain bins. Speaker 500:38:33So again, I'll come back to that later during the call. I'm going to just take a moment and answer Anita's question about total rock fill for the TMF. It's 7,800,000 tonnes in 2024. So I'll come back with a grade on that Speaker 300:38:51stockpile. Okay, great. Thanks. And then maybe just given the higher cost of Castle, I mean, I think it makes sense to suspend operations. But just looking across the portfolio, you guys have other a couple of other operations kind of running towards those cost levels at Filos and Santa Luz. Speaker 300:39:12And so just wondering at Filos, if there's a more definitive cutoff point on the negotiations where you kind of decide you can't subsidize it anymore? And then at Santa Luz, you guys are now several years through an 8 year mine life for an asset that's had challenges dating back a decade ago under Yamana. So just wondering if there's a point at which you decide that that asset consumes too much capital and attention to continue to operate? Speaker 500:39:42Okay. So with Los Filos, we knew the first half of the year would be weaker than the second half. And you can already see the now that we've done the relocation of the conveyor and we have all the material under leach, our ounces are significantly up in Q2. They'll continue to go up in the second half of the year. All in sustaining cost is, in that case, being driven by the ounces that we're producing. Speaker 500:40:11So we should see that improve in Los Filos in the second half of the year as well. The bigger question at Los Filos has been the establishment of new agreements. That's the key element for Filos being able to get a path forward and to build the CIL. So it's a large mine with a great opportunity. We're giving it our best shot be able to work out everything with the communities and we're in dialogue and we hope that we can determine the new path for Filos overall. Speaker 500:40:47With Santa Luz, yes, we've well, let's first of all, we're significantly better than the previous recoveries at Santa Luz. We invested in the new technology and we've been working on getting it to refine it. Obviously, scaling up from pilot plant to the industrial scale has had challenges. And we see it as a very prospective district. If I turned it over to Scott, he'd be able to talk at length about the opportunities that we have in the immediate area around Santa Luz. Speaker 500:41:21So we're there because we believe in the long term side of it, albeit we're in commissioning on the desliming circuit and we have a target that we want to achieve this year. And we will continue to look at this from the big picture. So as opposed to doing a strategic view on Santeluz at this point in time. We have these 2 larger projects in the plant that we wanted to get through and see them perform and that's the trunnion and the desliming. Speaker 200:41:53I mean Wayne, as a general comment, we're in the business of producing gold, but obviously we want to produce gold profitably. We have no interest in being a charity here. So of course, if a mine is proving not to be economic, we don't see the long term economic benefit of running a mine, then we're going to assess options for that mine. Castle is a bit of a different story because it was a very small contract, almost pilot plant type of operation while we work towards a large expansion. And we ended up running it longer than we had anticipated just because of the permit timelines. Speaker 200:42:28So in that case, to your point, it made sense for us to do that and really focus on the permitting for Phase 2. But as Doug said, Los Filos is a large orebody attractive deposit. Obviously, the long term plan there is build a CIL plant and that massively increases recoveries and really changes the flavor of that mine. To do that, we've got to have new agreements with the community. So that's the focus right now. Speaker 200:42:54In Santa Luz, yes, there's no question, it's been a challenge for us. It's new technology and not around the world, but it is a novel use of that technology at Santa Luz. And the team has been it's a little bit like whack a mole. We get some great results and then something happens and we kind of take a couple of steps back. But I was just there, spent a lot of time with the team. Speaker 200:43:18They've done a lot of good work and we're expecting a much better second half of the year here at Santa Luz. Speaker 300:43:27Okay, great. Yes, hopefully, you guys can get up to the 70% plus level in the second half. Maybe just last one for me. Looking ahead on the convert coming due in October, Peter had alluded to having the cash on hand and cash from operations to cover that, but would seem to consume quite a bit of capital and reserve during the ramp up. So I guess just in terms of alternative funding options, would you look to refi with another convert similar to the one done last September? Speaker 300:44:00Or is there potential to renew the ATM? Or just curious what the available funding options might be if you have to repay that with cash? Speaker 200:44:12Pete, do you want to handle that one? Speaker 400:44:15Sure. First of all, Wayne, we do believe we'll be able to manage it through cash and our existing liquidity. If you recall, when we did the convert last year, we were expecting an April maturity on that note. And so we issued that convert at that time, then we took the proceeds of that, put it on the revolver to reduce interest costs in the meantime. So we have room on the revolver to draw that was put there, thanks to that note issuance from last year, as well as existing cash. Speaker 400:44:43With respect to Greenstone, we are given the ramp up rate that we're and trajectory recurring we're currently on with in addition with commercial production expected this quarter. We're currently comfortable that we can repay that note if needs be when it comes mature through existing sources. With respect to prospective sources, of course, everything you mentioned is available, but they're not in our current plan. Speaker 300:45:16Okay, great. Thanks for taking my questions and best of luck with the ramp up in operations Speaker 200:45:20in the months ahead. Thanks, Wayne. Speaker 100:45:24Thanks, Wayne. So we do have some questions online that I still have already been answered in the other things that the speakers have addressed. So the archive of the website will be up on probably sorry, archive of the webcast will be on the website in a couple of hours. So you're welcome to go back and have another listen. We will have a transcript of the entire thing up probably on Saturday. Speaker 100:45:46If there is other questions, I will get back to you later this evening. I have to get Pete on the road because he's got a big cycle ahead of him today. But I will get back to everybody else sometime tonight. So Greg, do you have any closing remarks? Speaker 200:46:00No. Just thanks again everyone for attending the call and you know where to find us if you have got any more questions. Speaker 100:46:06Perfect. Peter? Speaker 400:46:07I'm just going to add, please donate. It's a great cause. Speaker 100:46:12Thanks very much. Operator, you can now conclude the call. Operator00:46:17Thank you. This brings to a close today's conference call. You may disconnect your lines. Thank you for participating and have a pleasant day.Read morePowered by Key Takeaways Equinox completed the 40% Greenstone acquisition in mid-May and achieved first gold pour on May 22, producing over 16,000 ounces in Q2 and nearly 20,000 ounces in July, aiming for commercial production by Q3 end. Q2 gold production totaled 122,000 ounces at cash cost $1,747/oz and AISC $2,041/oz, with H1 at 234,000 ounces (cash cost $1,653/oz, AISC $1,993/oz); full-year guidance was updated to 655–750 koz at cash cost $1,305–$1,405/oz and AISC $1,635–$1,735/oz. Operations faced setbacks including a fatality at Brazil’s Fazenda mine prompting a site safety suspension, geotechnical instability in Aurizona’s Piava pit halting mining and mill idling, and slower heap recoveries at Mesquite, driving revisions to site guidance. The company strengthened liquidity and reduced leverage with a $500 M term loan, $299 M bought-deal equity raise, $40 M Orion promissory note, and extended convertible notes, ending Q2 with $160 M cash and $105 M revolver capacity. With Greenstone ramp providing substantial free cash flow, Equinox will prioritize deleveraging in coming years and continue advancing Castle Mountain Phase 2 expansion through permitting while managing residual leaching of Phase 1 material. AI Generated. May Contain Errors.Conference Call Audio Live Call not available Earnings Conference CallEquinox Gold Q2 202400:00 / 00:00Speed:1x1.25x1.5x2x Earnings DocumentsSlide DeckInterim report Equinox Gold Earnings HeadlinesEquinox Gold: Deserves Trading Below Book Value While Gold ShinesMay 23 at 4:04 AM | seekingalpha.comCormark Has Optimistic Outlook of Equinox Gold Q2 EarningsMay 17, 2025 | americanbankingnews.comTrump wipes out trillions overnight…Is there anybody more powerful than Donald Trump right now? In a single tariff announcement, he wiped out nearly $5 trillion in wealth from the S&P 500 and $6.4 trillion from the Dow Jones… Not to mention the countless trillions of dollars lost in every market around the world… leaving the major political powers scrambling in fear of Trump’s next move.May 25, 2025 | Porter & Company (Ad)Earnings call transcript: Equinox Gold Q1 2025 earnings miss expectationsMay 9, 2025 | uk.investing.comEquinox Gold Corporation (EQX) Q1 2025 Earnings Call TranscriptMay 8, 2025 | seekingalpha.comEquinox Gold Corp. (EQX): Among Billionaire John Paulson’s Stocks with Huge Upside PotentialMay 7, 2025 | msn.comSee More Equinox Gold Headlines Get Earnings Announcements in your inboxWant to stay updated on the latest earnings announcements and upcoming reports for companies like Equinox Gold? Sign up for Earnings360's daily newsletter to receive timely earnings updates on Equinox Gold and other key companies, straight to your email. Email Address About Equinox GoldEquinox Gold (NYSEAMERICAN:EQX) engages in the exploration, acquisition, development, and operation of mineral properties in the Americas. It explores gold and silver deposits. It holds interest in properties in California located in the United States; Guerrero State located in Mexico; Maranhão, Bahia, and Mina Gerais state located in Brazil; and Ontario, Canada. The company was formerly known as Trek Mining Inc. and changed its name to Equinox Gold Corp. in December 2017. Equinox Gold Corp. was incorporated in 2007 and is headquartered in Vancouver, Canada.View Equinox Gold ProfileRead more More Earnings Resources from MarketBeat Earnings Tools Today's Earnings Tomorrow's Earnings Next Week's Earnings Upcoming Earnings Calls Earnings Newsletter Earnings Call Transcripts Earnings Beats & Misses Corporate Guidance Earnings Screener Earnings By Country U.S. Earnings Reports Canadian Earnings Reports U.K. Earnings Reports Latest Articles Booz Allen Hamilton Earnings: 3 Bullish Signals for BAH StockAdvance Auto Parts Jumps on Surprise Earnings BeatAlibaba's Earnings Just Changed Everything for the StockCisco Stock Eyes New Highs in 2025 on AI, Earnings, UpgradesSymbotic Gets Big Earnings Lift: Is the Stock Investable Again?D-Wave Pushes Back on Short Seller Case With Strong EarningsAppLovin Surges on Earnings: What's Next for This Tech Standout? Upcoming Earnings PDD (5/27/2025)AutoZone (5/27/2025)Bank of Nova Scotia (5/27/2025)NVIDIA (5/28/2025)Synopsys (5/28/2025)Bank of Montreal (5/28/2025)Salesforce (5/28/2025)Haleon (5/28/2025)Costco Wholesale (5/29/2025)Marvell Technology (5/29/2025) Get 30 Days of MarketBeat All Access for Free Sign up for MarketBeat All Access to gain access to MarketBeat's full suite of research tools. Start Your 30-Day Trial MarketBeat All Access Features Best-in-Class Portfolio Monitoring Get personalized stock ideas. Compare portfolio to indices. Check stock news, ratings, SEC filings, and more. Stock Ideas and Recommendations See daily stock ideas from top analysts. Receive short-term trading ideas from MarketBeat. Identify trending stocks on social media. Advanced Stock Screeners and Research Tools Use our seven stock screeners to find suitable stocks. Stay informed with MarketBeat's real-time news. Export data to Excel for personal analysis. Sign in to your free account to enjoy these benefits In-depth profiles and analysis for 20,000 public companies. Real-time analyst ratings, insider transactions, earnings data, and more. Our daily ratings and market update email newsletter. Sign in to your free account to enjoy all that MarketBeat has to offer. Sign In Create Account Your Email Address: Email Address Required Your Password: Password Required Log In or Sign in with Facebook Sign in with Google Forgot your password? Your Email Address: Please enter your email address. Please enter a valid email address Choose a Password: Please enter your password. Your password must be at least 8 characters long and contain at least 1 number, 1 letter, and 1 special character. Create My Account (Free) or Sign in with Facebook Sign in with Google By creating a free account, you agree to our terms of service. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
There are 7 speakers on the call. Operator00:00:00Thank you for standing by. This is the conference operator. Welcome to the Equinox Gold Second Quarter 2024 Results and Corporate Update. As a reminder, all participants are in listen only mode and the conference is being recorded. After the presentation, there will be an opportunity to ask questions. Operator00:00:39I would now like to turn the conference over to Rylin Bailey, Vice President, Investor Relations for Equinox Gold. Please go ahead. Speaker 100:00:49Thank you, Gaylene, and thank you everybody for joining us today for our Q2 call. Peter and I are dialing in from beautiful Princeton, BC because we are 2 days into the ride to Greenstone. So this is a big not cross Canada, I guess cross half of Canada. We are riding from Vancouver to our new mine in Geraldton, Ontario to celebrate the mine opening, but also to raise money for the Geraldton District Hospital, which is the hospital that serves the Greenstone Mine workforce and also 5 indigenous communities and about almost a 3000 Square Kilometre region in Ontario. So it's going really well so far. Speaker 100:01:22It's super exciting. We've got people from our mine sites in Brazil and the States and in Mexico that have flown up to Canada to join us for the ride. And we're making our way across the country, raising money for the hospital. Like I said, we've raised almost $1,200,000 so far, thanks to the generosity of our vendors and some industry sponsors. We're also raising money for 4 schools and a hospital in Brazil and for the Alzheimer's Association of California. Speaker 100:01:47So if you're interested in more information about that, you can go to the Ride to Greenstone website or the Equinox Gold website, and please do follow the progress as our cyclists make their way across the country. After that plug, we'll now turn it over to the conference call, so we will, of course, be making a number forward looking statements today. Please do visit our website, SEDAR and EDGAR to learn more about the company. And I'll turn the call over now to our President and CEO, Greg Smith. Speaker 200:02:14Thanks, Rylin. Good morning and thanks everyone for joining the call today. On the line with me is our COO, Doug Reddy our CFO, Peter Hardy and our EVP of Exploration, Scott Heffernan and of course, our VP of Investor Relations, who you just heard from, Rylin Bailey. Today, we are discussing Equinox Gold's 2024 Second Quarter Financial and Operating Results. I'll start with a broad overview of the quarter, and then I'll turn over the call to Pete and Doug for more details. Speaker 200:02:44I'm going to start with safety. We did unfortunately have a fatality at our Fazenda mine in Brazil in June. This is a tragedy for all of us at Equinox and we extend our deepest sympathies to our employees and also the family, friends and co workers. We did have a site wide suspension of operations at Pazenda in June to facilitate both the investigation and also to refresh our site safety training. On the environment side, we did have no significant environmental incidents during the Q2. Speaker 200:03:21And as previously reported, we published our fiscal 2023 ESG report in May during the quarter and you can find the report on the Equinox Gold website. Before the quarter, we produced just over 122,000 ounces of gold and sold just over 115,000 ounces at a cash cost per ounce sold of $17.47 and an all in sustaining cost per ounce sold of $2,041 per ounce. For the 1st 6 months of the year, we produced approximately 234,000 ounces and sold approximately 232,000 ounces at cash cost of $16.53 per ounce and all in sustaining cost of $19.93 per ounce. We did have a few developments during the quarter that affected our production and costs in Q2 and also drove an update to our fiscal 2024 guidance. In mid May, we completed the acquisition of the 40% of our Greenstone mine that we didn't already own. Speaker 200:04:19We spoke about this on the Q1 call and in a couple of press releases, but as a reminder, this transaction delivers full ownership of the Greenstone mine to Equinox Gold and consolidates ownership of Greenstone, which is one of the largest and highest grade open pit gold mines of scale in Canada. This transaction is accretive to our cash flow and our EBITDA. It delivers substantial near term value and it increases the company's average mine life reserves production, all while lowering our consolidated per ounce operating costs. Greenstone has been ramping up largely on plan with our first gold pour in late May and just over 16,000 ounces produced through the end of June. Production has continued to ramp up with just under 20,000 ounces produced in July alone at Greenstone. Speaker 200:05:05We recently concluded a multi day shutdown to address various wear and process issues identified through the startup and are now pushing toward achieving commercial production by the end of Q3. With the ramp up progressing well, we've maintained our guidance Greenstone with an increase to reflect the consolidation of ownership. We previously reported in April that we experienced some geotechnical issues in south wall of the Piava open pit at Aurizona and that we had temporarily suspended mining in Piava. We continue to process stockpiled ore through April and production in Q2 at Aurizona primarily reflects processing of this material. We then idled the mill in May June and accelerated mining in the new Tatajuba open pit. Speaker 200:05:50We did begin processing first ore from Tatajuba in early July. We are working on mitigation activities to recommence mining in Piaba and this is progressing well. As the timing of starting mining again in Piaba does remain uncertain, guidance Aurizona has been reduced to take into account lost production during the suspension of processing in May June and also to reflect the lower grade ore mined primarily from Tatajuba through the remainder of the year. At Mesquite, 2024 is primarily a stripping year as we pre strip the Ginger pit, which supplies ore to the mine or to the heap in 2025. Mining at Mesquite has been performing well with recoverable ounce stacked exceeding plan. Speaker 200:06:34However, we are seeing slower than expected recoveries off the heap leach pad from ore stacked in prior periods in part due to the increasing pad height. We are working to accelerate production, but we have reduced our 2024 production guidance for Mesquite to account for the slower recoveries. Finally, the company has concluded its previously reported assessment of the Phase 1 operations at Castle Mountain and we've We will continue to focus We will continue to focus on advancing permitting and engineering of the Phase 2 expansion at Castle. Our guidance has been updated to reflect this change at Castle Mountain and Castle will be reported as a development project going forward. Of course, we will continue to recover ounces off the pad through the year and into next year. Speaker 200:07:24With these changes reflected, consolidated guidance for 2024 has been updated from 660,000 to 750,000 ounces of gold to $655,000 to $750,000 ounces of gold with cost updated to cash costs of $13.05 to $14.05 per ounce and all in sustaining costs of $16.35 to $17.35 per ounce. This continues to reflect a substantial increase in gold production at much lower costs over the second half of the year. With that, I'll turn it over to Pete to discuss our financial results. Speaker 300:08:00Thanks, Greg. Speaker 400:08:02We're now on Slide 7 in the presentation. During Q2, we sold 115,000 ounces of gold at a realized price of $2,328 per ounce for revenues of $269,000,000 Total sales included 10,000 ounces sold by Greenstone. Income from mine operations was $27,000,000 We had $199,000,000 in operating expenses in Q2 'twenty four compared to $193,000,000 in Q2 2023. Operating expense in Q2 2024 increased 3% compared to Q2 2023, primarily due to the contribution of operating expense at Greenstone, which was a construction project in 2023 and did not have operating expenses and a higher operating expense at Los Filos, which was driven by an increase in the in underground mining activity, offset by lower operating expense at Aurizona that Greg mentioned earlier. On a per unit basis, we had a higher than usual Q2 twenty twenty four cash cost of $17.47 an ounce. Speaker 400:09:03The increase over previous quarters is primarily volume driven with the lower production at Aurizona due to the geotechnical issue at the Piava pit. The same explanation applies to our higher than usual all in sustaining cost per ounce for the quarter. Note that Greenstone is not yet in commercial production, so when you're looking at our cost metrics, the 10,000 ounces if sold along with the related cost of production are excluded from the calculation of cash cost and all in sustaining cost metrics we reported in Q2. That said, the revenues and related operating cost are still reported in the income statement as required by IFRS. Our EBITDA in Q2 2024 was 510,000,000 Included in EBITDA is a fair value gain on remeasurement of our Greenstone ownership interest that recorded when moving from proportionate to full consolidation. Speaker 400:09:56For accounting purposes, we record the changes if you sold the 60% ownership interest we had at fair value. The gain results from the difference in fair value and the cost that the 60% interest was carried at, and that gain is about 470,000,000 dollars Our adjusted EBITDA of $51,000,000 for Q2 is the same as Q1 2024 and down $19,000,000 from Q2 2023's adjusted EBITDA of $71,000,000 The decrease in adjusted EBITDA in Q2 2024 compared to Q2 2023 was primarily due to the impact of an $8,800,000 realized loss on gold contracts in Q2 twenty twenty four. We didn't have any in Q2 2023. In addition, we had a small realized loss on foreign exchange contracts this quarter, whereas in Q2 2023, we had a $9,100,000 realized gain on the same. We had net income of 2 0 $4,000,000 for basic earnings per share of $0.72 $0.61 a share fully diluted. Speaker 400:10:54On an adjusted basis, we had a net loss of $6,000,000 or $0.01 per share. Cash flow from operations before changes in non cash working capital was $45,000,000 or $0.12 a share. With respect to our sustaining spend for Q2, we spent $31,000,000 which is pretty much in line with what we did in Q1 this year. With regards to Greenstone, with the mine and plant ramping up, Greenstone should now fund itself from a cash flow perspective. For Greenstone, on a 100% basis, a total of 1 point $37,000,000,000 project to date has been spent on construction and commissioning. Speaker 400:11:28Equinox's share of that spend was $55,000,000 during the quarter, $109,000,000 year to date and $834,000,000 project to date, which excludes capitalized interest and other non cash amounts capitalized. Had a busy quarter for corporate financing activity. To fund the $955,000,000 we needed to acquire the remaining ownership of Greenstone, amended our existing senior revolving credit facility to arrange a $500,000,000 term loan, completed a bought deal equity financing for gross proceeds of $299,000,000 we issued 42,000,000 shares directly to Orion Finance and issued a $40,000,000 promissory note to Orion Mine Finance that matures in December 2024. Under the terms of the $299,000,000 bought deal equity financing, the company issued 56,400,000 shares at $5.30 per share. The $500,000,000 term loan matures May 13, 2027. Speaker 400:12:23No principal repayments are required under the term loan for the 1st 2 years of the 3 year term. Quarterly repayments will commence on August 13, 2026, equal to 10% of the then outstanding principal amount, with the remaining outstanding principal payable at maturity. The company may repay any portion of the outstanding term loan at any time without penalty. Interest, covenants and other terms are substantially consistent with the company's existing revolving credit facility and the term loan benefits from the same security package as the revolving credit facility. During Q2, we also amended 2 of the convertible notes by extending their maturities by 6 months. Speaker 400:13:05The maturity date of the 2019 convertible notes was extended from April 12 of this year to October 12, and the maturity date of the 2020 convertible notes was extended from March 10, 2025 to September 10, 2025. In addition, the conversion price of the 2020 convertible notes was amended from $7.80 per share to $6.50 per share. For the $500,000,000 term loan, the company was required to have in place 328,000 ounces of gold hedges of our forward gold production through mid-twenty 26. The company elect and we already had some of those gold hedges in place for the second half of this year that we added to. The company elected to wait the hedges into the next 12 months using gold collars. Speaker 400:13:52The collars are arranged as follows. For the second half of twenty twenty four, there are 188,000 ounces hedged with a floor of 2,150 and a ceiling of 2,738 per ounce. For the first half of twenty twenty five, there's 100,000 ounces hedged with a floor of $2,189 and a ceiling of $2,905 an ounce. And for the second half of twenty twenty five, 20,000 ounces with a floor of 2,100 and a ceiling of 3,487 per ounce. And finally, for the first half of twenty twenty six, also 20,000 ounces with a floor of 2,100 an ounce and a ceiling of 3,487 per ounce. Speaker 400:14:32Just with respect to those convertible notes, extending the notes, the maturity of those 2 convertible notes significantly enhances our financial flexibility as we advance commissioning of our world class Greenstone Gold Mine, which remains on track to pour gold this quarter. Moving to Slide 8. With respect to our available liquidity at June 30, we had $160,000,000 of unrestricted cash on hand and $105,000,000 available to draw on a revolving credit facility. The first of our debt maturities comes in October with $140,000,000 2019 convertible note I just mentioned. It has a conversion price of $5.25 per share. Speaker 400:15:09Should the note holders decide not to convert, the company will repay the note using its existing cash and liquidity. Moving to Slide 9. With Greenstone construction complete and commercial production on the near horizon, the financial focus switches to deleveraging. Free cash flow produced by the mines will be used to pay down debt. For the 1st few years at Equinox Gold, we've acquiring and building mines and have been using debt as one of the funding methods for doing so, including an additional $500,000,000 term loan to consolidate our Greenstone ownership. Speaker 400:15:42This slide demonstrates Equinox Gold's historical leverage as measured by net debt to EBITDA ratio from Q1 2020 through Q4 2023 and pro form a leverage through 2026 as per analyst consensus. The general trend we see is that leverage in the company increased as acquisitions were completed and mines were being built. This is a natural consequence of using debt as one lever for funding acquisitions and construction. Leverage peaked in Q1 2020, a few months after construction of Aurizona was completed and again in late 2022 as construction of Greenstone was ongoing and construction of the Santa Luz mine was completed. Another trend we see in this chart is that as the mines are commissioned and ramped up, that leverage decreases as Equinox Gold has a benefit of EBITDA and cash flow generated by the new mines. Speaker 400:16:26And we expect the same as Greenstone enters into commercial production hopefully later this quarter. With that, I turn the presentation over to Doug for a review of the operations. Speaker 500:16:36Thanks, Pete. We're now on Slide 11 of the presentation. At the Mesquite mine, gold production was 17,607 ounces with an all in sustaining cost of $12.83 per ounce. Waste stripping continued in the Ginger pit and the majority of the ore from that pit goes to leach pad starting in Q1 of 2025. For the rest of 2024, production is mostly drawdown of the leach pad inventory side slope leaching and leaching of additional ore coming from current mining and rehandling and re leaching of the old Vista pad material. Speaker 500:17:13The recoveries from the leach pad have been slower than expected due to pad height and associated longer leach cycles. At Castle Mountain, production was up over Q1 at 6,148 ounces at an all in sustaining cost of 14 $24 per ounce. Phase 1 is a small operation that is mining and processing low grade historic backfill material that needs to be removed from the old open pits prior to mining in situ material in Phase 2. We completed a review of the mine plan and costs at Castle Mountain for Phase 1 and concluded that mining will be suspended in August for the duration of the Phase 2 permitting. Residual leaching will continue through 2024 And we continue with the Phase 2 permitting process. Speaker 500:18:07At Los Filos, production increased during Q2 to 37,000 430 ounces and this should continue to improve in H2. The all in sustaining cost was $2,274 per ounce. During the quarter, the crusher was brought back online and all the material for crushing that had accumulated while the relocation of the conveyor was underway was then crushed and is now under leach. The productivity program that's been in place at Los Filos for the last 2 years continues to show improvement and we saw an increase in Los Filos underground mine production started development work in the quarter. Our dialogue with our community partners continues. Speaker 500:19:04Continue to work towards establishing new agreements so that we can ensure long term economic viability and stability for the mine. If we move on to the next page. In Brazil, at the Aurizona mine, production was 6,309 ounces with a very high all in sustaining cost over $3,000 per ounce. This reflects the standby costs that being incurred while the plant was idle and the low ounces produced in the quarter, which resulted in a high cash cost. As previously announced and mentioned earlier in this call, we suspended mining in the Piavo pit in April after geotechnical instability led to the displacement of material in 2 locations in the south wall of the Piaba pit. Speaker 500:19:54We accelerated the startup of Tatajuba open pit and after 2 months with no ore processing, we restarted the process plant at the beginning of July. We continue working on remediation planning and activities in the Piaba open pit with safety being the priority. Work at the moment on Piaba includes recontouring of the pit wall that will happen in 2 areas. We are drilling a series of dewatering holes and we've been installing additional monitoring equipment and completing external reviews of geotechnical and hydrogeological information. At the Fazenda mine, regrettably, we had a fatality in the underground portion of the mine as discussed earlier in the call. Speaker 500:20:42Production at Fazenda was 14,178 ounces and the all in sustaining cost was $18.76 per ounce for the quarter. Plant feed is currently 35% from open pit, 65% from underground and recovery is at 91%. Currently mining is approximately fifty-fifty open pit and underground. The open pit contractor is now fully mobilized at catching up on the mine plan through the rest of the year. In the underground mine, we are mobilizing additional equipment to facilitate a catch up on development so that we can access additional stopes in Q3 and Q4. Speaker 500:21:25At RDM, gold production was 10,675 ounces and the all in sustaining cost was $17.74 per ounce. We changed the rental mining fleet and are catching up on the mining in H2. Construction of the dry stack tailings area is complete and is now fully in operation with cyclone tailings being dried and placed in the storage area. At Santeluz, production was up compared to Q1 at 13,627 ounces and an all in sustaining cost was $2,399 per ounce. Recovery was below plan at 60% for Q2. Speaker 500:22:10Dilution efficiency and electro winning modifications were completed in the quarter. SAG mill liners and a new trunnion were installed. The new trunnion enables has enabled throughput to be increased by about 10%. And a new desliming circuit was added. The desliming circuit is intended to remove a portion of the total organic carbon and improve overall recovery by about 6%. Speaker 500:22:35The circuit was brought online and is in commissioning through Q3. The objective is to achieve recoveries around 73% or higher for the second half of the year. Moving on to Page 13. At Greenstone, first ore was introduced to the high pressure grinding rolls and grinding circuits on April 6. The first gold pour was on May 22 and the mine poured produced 16,247 ounces in Q2. Speaker 500:23:06Milling throughput achieved a rolling 30 day average of 59% of the nameplate of 27,000 tonnes per day as of July 22. And then as we came to the end of the month, we had our planned shutdown, major shutdown, and we were up and running back on schedule after that shutdown was completed. Overall, the ramp up is going very well. We mined over 7,000,000 tons in the quarter with over 1,200,000 tons of that being ore. Stockpile was 2,000,000 tons at the end of the quarter. Speaker 500:23:40The fleet now has 25 haul trucks and 4 shovels, and we look forward to commercial production during Q3. So with that, I'm going to hand it back to Greg. Speaker 200:23:52Thanks, Doug. Yes, it's been a mixed quarter for us. We've had to work through some challenges at a few of our mines and particularly at Aurizona and we've had to make some revisions to our guidance as a result, but also a very positive quarter for the company in that we were able to complete the acquisition of the rest of Greenstone, achieve first gold pour and then start the ramp up toward commercial production. And really we're at an inflection point now. We expect a stronger second half from a number of our mines, but more importantly, Greenstone is ramping up to commercial production over the next few months and we already produced more gold at Greenstone in July than we did in all of Q2. Speaker 200:24:32So the big picture here is we are significantly increasing our production at lower cost during a period of historically strong gold prices and what we think is a continuing bullish macro outlook for gold. And I think I'll wrap it up there and turn it over to Rylin to start Speaker 400:24:50the Q and A. Speaker 100:24:50Thanks, Greg and Doug. Gaylene, can you please ask remind our participants how to ask a question? Speaker 600:24:56Certainly. Operator00:25:19Box in the lower left corner of the webcast frame. We'll pause for a moment as callers join the queue. Speaker 100:25:28So I do have a few questions from online. So one that came in first, we will ask first. How are you going to catch up in the second half of the year to achieve your guidance? Speaker 200:25:38Sure, I can take that. I mean, the main plan here, Rillin, as you can see from the guidance, is that most of our sites will have a stronger second half of the year, in particularly Los Filos and of course Greenstone as we ramp up to commercial production. Greenstone is a very large mine and production of Greenstone definitely moves the needle for us. So, yes, the second half of the year will produce a lot more gold than we did in the first half. Speaker 100:26:04Okay. Mike Parkin sent me a question. He is our analyst from National Bank, sent me a question by email. This is for Peter. What will Capital Mountain Care maintenance cost be on an annual basis? Speaker 100:26:14Will there be any severance payments? And if so, how much and when will those flow through the financials? Speaker 400:26:22Thanks Mike. I'll start with the later part. Yes, there will be severance payments. We haven't updated the market provided guidance on what care and maintenance will look like heading into next year and beyond. And we'll do so when we update guidance or perhaps earlier than that. Speaker 400:26:45With respect to the remainder of the year, we'll be residual leaching. So the guidance that we provided for Castle Mountain effectively takes us through the point at which we go on to residual leach, which will be sometime during Q3. We expect to continue to pull ounces from the pad for several months after. And we'll provide a more comprehensive update on those costs as we move forward. It will depend in part on when the residual leach tapers off and when it no longer is beneficial to continue to residual leach based on the ounces being pulled and the cost to do it. Speaker 100:27:29Okay. Thank you, Peter. A question from Speaker 500:27:33I'll just add to that, that at Castle Mountain, our mining and our crushing is contractors. So those contract terminations have been provided to the contractors. And we have a very small team overall who will continue to work on the residual leaching. So it is quite a compact and small operation or remains a small team as we move into residual leach. Speaker 400:28:00Thanks, Doug. Speaker 100:28:01Thank you. A question from our Carrie Smith, our analyst at Haywood Securities, who is currently on an airplane. When do you expect to be able to get back into mining at Payaba? And how many tons of ore or ounces of production do you have at Tatajuba? Speaker 500:28:16So for return to mining in Piaba, we're doing work in Piaba now, but it's at the upper areas of the pit. We will, during the course of this year, be going in and mining certain areas, especially on the west end of Piaba from pit. Overall plan is based on doing all the dewatering program and all the geotechnical and recontouring activities. We would like to be doing some additional Piaba pit by the end of this year, but the real focus is going to be doing a large program in 2025. But again, it all is dependent on working through all of our activities that we're doing to remediate and make the bit totally safe, keep the regulators totally informed and being able to move in and be able to mine especially on the east end of the pit. Speaker 100:29:18Thank you, Doug. Operator, can we please take some questions from the phone? Operator00:29:23Certainly. The first question from the phone line is from Anubha Soni with CIBC World Markets. Please go ahead. Speaker 600:29:30Hi, good morning, everyone. First question, I think I'm going to focus on Greenstone. When we look at the throughput rates that you delivered this quarter, can you just give us a little idea of how that ramped up over the course of the quarter and what the exit rates are right now in throughput? Speaker 500:29:52So April, May, we were 40%, 50% of rated throughput, came up to just under 60% as we came into July. Then we had a major shut. So we've taken care of a lot of the items that we've noticed during the ramp up and we'll continue we've restarted and continue with the ramp up in August. I'm sure I'm not sure exactly the other details that you're looking for. Speaker 600:30:24No, that's good. Another question in terms of the definition of commercial production. I noticed it said within 10% of the design grades. You guys are substantially over the design grades. And I have a second question related to that in a second. Speaker 600:30:41But the does that mean that you when you're looking for commercial production, you're looking for it to come down to the sort of 1.5 that you were expecting over the next, I guess, 3, 4 years rather than the 2.5 that you delivered this quarter? Speaker 500:30:54Yes. It won't continue at the 2.5. I mean, that was essentially, as you'll be aware, putting a lot of ounces that go into the circuit. And that was done where we the ability to feed some high grade material and be able to add that into the mill. And going forward, it gets tempered down to more the targeted production overall production rate. Speaker 500:31:20So it won't continue at 2.5. That would be glorious, but we can't do that forever. Speaker 600:31:26It was a good surprise. I was but I didn't hold my breath that it sustained. Speaker 500:31:33Yes, I anticipated that somebody would do the calc and say, how come your ounces produced and you have 88% recovery. But if you look at the number of ounces that go into circuit, then it all makes sense. And by putting in the higher grade, we took care of building up the ounces in circuit very quickly. Speaker 600:31:51Okay. And then as we get to the so doing some calculations on the mining and the ore stockpile rates, I think can you talk about the truck availability? I think you're getting around 2,000,000 tonnes per truck, if I did the math right on that per annum, if you annualize it. And are design rates on those trucks more like could you just tell me what the design rates on the trucks are? I thought they were somewhere around 3%, 3.5%, but of course that depends on your haul distances. Speaker 600:32:22So can you just talk about the availability on the trucks? Yes. Speaker 500:32:26Haul distances are affected at this very start for a couple of reasons. One that, while we've been pioneering essentially the pit, we've been moving a lot of the soil material, some of which needs to be treated. So that means we have to take it down to an area where it can be dealt with. That consumes some of the cycle time. We've also been doing a lot of work taking clean waste down to our tailings facility, again, longer cycle time for those trucks. Speaker 500:32:58So you can't really you'd have to separate them out between mine and those other activities. But essentially with a fleet of 25 trucks, 4 shovels on-site, we'll be continuing the ramp up towards a capacity of 180,000 tonnes a day by Speaker 200:33:17the end of the year. Anita, it's Greg here. I might just add. I don't know if there's a recent picture on our website, but if there's not, I can send one to you. The first this 1st year of mining at Greenstone is a little bit complex a couple of reasons. Speaker 200:33:32And you'll remember when we were there, there's the old McLeod tailings that are there from previous mining. Part of our permit requires that we excavate those tailings and move them to our facility and we do have some trucks dedicated to doing that. We also have this, we call it Type D soil, which is contaminated soil in the main open pit, which is a delicate job to move that material. And we're in the process of doing that. And as we do that, it opens up additional areas of that open pit for us to mine. Speaker 200:34:00So if you looked at a recent picture, what you'll see there is sort of a couple of awkward islands in the middle of our pit where we're still excavating the Type D soil. And it does provide some complexity in mining efficiency in these sort of the first half of this year. We're working through that quickly and I think over the next quarter or so largely through the Type D soil, we opened up the pit, The cloud tailings are well advanced and we start to really see those efficiencies as we go into Q4 here. So it's just for the 1st year, as Doug said, pioneering this pit with some of the historic issues does make it a little more complex. But again, we've been able to build a large stockpile, feed the mill and are on track to be able to meet our targets. Speaker 600:34:40Okay. And then just a last question on that, on the mining rates. I think they meant you guys mentioned that some of it was dedicate, while looking back at the last couple of quarters. But basically, it was talking about how the mining rates, some of that was dedicated to providing waste rock for the tailings dam. Are you through that? Speaker 600:34:57Is it now are you basically just using the fleet to do ore and waste in the pit? Or are you still looking at helping out the tailings facility? Speaker 500:35:06No, we're still hauling clean waste down to the TMF. Speaker 600:35:12Okay. And how much It's Speaker 500:35:13on the next stage. Speaker 600:35:17Right. So how much material like in terms of millions of tons do you have to deliver to the waste rock to the tailings facilities this year? Speaker 500:35:28I'll get back to you shortly. Don't have that number on the top of my tongue, but I'll get back to you shortly. Speaker 600:35:34You don't have that memorized, Zach? Okay. That's it for my questions. I'll get back in the queue. Speaker 200:35:39Thanks, Elias. Thanks. Operator00:35:44The next question is from Wayne Lam with RBC Capital Markets. Please go ahead. Speaker 300:35:51Yes, thanks guys. I guess maybe just circling back to Greenstone, really nice to see you guys hit the 2,000,000 ton ore stockpile as planned. Could you give us a grade of the an idea of the grade of that stockpile? And then maybe just as a follow-up on the 2.5 gram tonne, Typically, we see much lower grade feed put through the early stages in ramping of the mill. But just wondering if you guys are seeing any positive reconciliation versus plan? Speaker 300:36:23And was some of the higher grade material put through the mill to accelerate some upfront cash flow? Speaker 200:36:31Wayne, it's Greg here. I'll start with the high grade into the plant and then Doug can respond to some of your other questions here. As we were ramping up, basically in the first couple of benches of or the first mining we did, we did have a fair bit of high grade ore. And as we started to ramp up the mill, we started to have very good recoveries right off the bat. So we're seeing plus 90% recoveries pretty much right away. Speaker 200:36:57In part that's because of the increased residence time in the tanks when you're not up to full capacity, but when you start one of these plants up, you've got to build up that inventory in the tanks and then you have the sort of rolling gold inventory in your tanks. Because we had access to such high grade material and we were getting the very high recoveries right out of the gate, We took that opportunity to feed in some high grade ore and ramp up that inventory quickly, which got us into producing gold more quickly than we otherwise would have. It wasn't a cash flow decision. It was more of a commissioning decision. And frankly, it was we had some very high grades that were coming out. Speaker 200:37:38Our stock Doug will get into it, but we've got different bins for stockpile. And we had a couple of days there where we were feeding, I think, 5 grams per tonne and material like that. So we were able to do that and as part of our commissioning and it reflects in the grade over the Q2. As Doug said to Anita, that's not something that's going to persist, but it was helpful as we were ramping up the plant. Speaker 500:38:04Yes. So the I think the other question was just about the stockpile where we're partly feeding from stockpile, but we're also doing some direct feed to the crusher as well. So it's not all first in, first out by any means. And reconciliation overall has been quite good. So average grade, I'd have to look it up because we have been focused on certain bins. Speaker 500:38:33So again, I'll come back to that later during the call. I'm going to just take a moment and answer Anita's question about total rock fill for the TMF. It's 7,800,000 tonnes in 2024. So I'll come back with a grade on that Speaker 300:38:51stockpile. Okay, great. Thanks. And then maybe just given the higher cost of Castle, I mean, I think it makes sense to suspend operations. But just looking across the portfolio, you guys have other a couple of other operations kind of running towards those cost levels at Filos and Santa Luz. Speaker 300:39:12And so just wondering at Filos, if there's a more definitive cutoff point on the negotiations where you kind of decide you can't subsidize it anymore? And then at Santa Luz, you guys are now several years through an 8 year mine life for an asset that's had challenges dating back a decade ago under Yamana. So just wondering if there's a point at which you decide that that asset consumes too much capital and attention to continue to operate? Speaker 500:39:42Okay. So with Los Filos, we knew the first half of the year would be weaker than the second half. And you can already see the now that we've done the relocation of the conveyor and we have all the material under leach, our ounces are significantly up in Q2. They'll continue to go up in the second half of the year. All in sustaining cost is, in that case, being driven by the ounces that we're producing. Speaker 500:40:11So we should see that improve in Los Filos in the second half of the year as well. The bigger question at Los Filos has been the establishment of new agreements. That's the key element for Filos being able to get a path forward and to build the CIL. So it's a large mine with a great opportunity. We're giving it our best shot be able to work out everything with the communities and we're in dialogue and we hope that we can determine the new path for Filos overall. Speaker 500:40:47With Santa Luz, yes, we've well, let's first of all, we're significantly better than the previous recoveries at Santa Luz. We invested in the new technology and we've been working on getting it to refine it. Obviously, scaling up from pilot plant to the industrial scale has had challenges. And we see it as a very prospective district. If I turned it over to Scott, he'd be able to talk at length about the opportunities that we have in the immediate area around Santa Luz. Speaker 500:41:21So we're there because we believe in the long term side of it, albeit we're in commissioning on the desliming circuit and we have a target that we want to achieve this year. And we will continue to look at this from the big picture. So as opposed to doing a strategic view on Santeluz at this point in time. We have these 2 larger projects in the plant that we wanted to get through and see them perform and that's the trunnion and the desliming. Speaker 200:41:53I mean Wayne, as a general comment, we're in the business of producing gold, but obviously we want to produce gold profitably. We have no interest in being a charity here. So of course, if a mine is proving not to be economic, we don't see the long term economic benefit of running a mine, then we're going to assess options for that mine. Castle is a bit of a different story because it was a very small contract, almost pilot plant type of operation while we work towards a large expansion. And we ended up running it longer than we had anticipated just because of the permit timelines. Speaker 200:42:28So in that case, to your point, it made sense for us to do that and really focus on the permitting for Phase 2. But as Doug said, Los Filos is a large orebody attractive deposit. Obviously, the long term plan there is build a CIL plant and that massively increases recoveries and really changes the flavor of that mine. To do that, we've got to have new agreements with the community. So that's the focus right now. Speaker 200:42:54In Santa Luz, yes, there's no question, it's been a challenge for us. It's new technology and not around the world, but it is a novel use of that technology at Santa Luz. And the team has been it's a little bit like whack a mole. We get some great results and then something happens and we kind of take a couple of steps back. But I was just there, spent a lot of time with the team. Speaker 200:43:18They've done a lot of good work and we're expecting a much better second half of the year here at Santa Luz. Speaker 300:43:27Okay, great. Yes, hopefully, you guys can get up to the 70% plus level in the second half. Maybe just last one for me. Looking ahead on the convert coming due in October, Peter had alluded to having the cash on hand and cash from operations to cover that, but would seem to consume quite a bit of capital and reserve during the ramp up. So I guess just in terms of alternative funding options, would you look to refi with another convert similar to the one done last September? Speaker 300:44:00Or is there potential to renew the ATM? Or just curious what the available funding options might be if you have to repay that with cash? Speaker 200:44:12Pete, do you want to handle that one? Speaker 400:44:15Sure. First of all, Wayne, we do believe we'll be able to manage it through cash and our existing liquidity. If you recall, when we did the convert last year, we were expecting an April maturity on that note. And so we issued that convert at that time, then we took the proceeds of that, put it on the revolver to reduce interest costs in the meantime. So we have room on the revolver to draw that was put there, thanks to that note issuance from last year, as well as existing cash. Speaker 400:44:43With respect to Greenstone, we are given the ramp up rate that we're and trajectory recurring we're currently on with in addition with commercial production expected this quarter. We're currently comfortable that we can repay that note if needs be when it comes mature through existing sources. With respect to prospective sources, of course, everything you mentioned is available, but they're not in our current plan. Speaker 300:45:16Okay, great. Thanks for taking my questions and best of luck with the ramp up in operations Speaker 200:45:20in the months ahead. Thanks, Wayne. Speaker 100:45:24Thanks, Wayne. So we do have some questions online that I still have already been answered in the other things that the speakers have addressed. So the archive of the website will be up on probably sorry, archive of the webcast will be on the website in a couple of hours. So you're welcome to go back and have another listen. We will have a transcript of the entire thing up probably on Saturday. Speaker 100:45:46If there is other questions, I will get back to you later this evening. I have to get Pete on the road because he's got a big cycle ahead of him today. But I will get back to everybody else sometime tonight. So Greg, do you have any closing remarks? Speaker 200:46:00No. Just thanks again everyone for attending the call and you know where to find us if you have got any more questions. Speaker 100:46:06Perfect. Peter? Speaker 400:46:07I'm just going to add, please donate. It's a great cause. Speaker 100:46:12Thanks very much. Operator, you can now conclude the call. Operator00:46:17Thank you. This brings to a close today's conference call. You may disconnect your lines. Thank you for participating and have a pleasant day.Read morePowered by