Severn Trent H1 2027 Earnings Call Transcript

Key Takeaways

  • Positive Sentiment: First-half earnings grew strongly: PBIT rose 13% and adjusted earnings per share increased more than 17% to £1.188, supported mainly by regulated bill increases.
  • Positive Sentiment: Investment and asset growth are accelerating: Capital investment rose 37% to more than £1 billion, and the company raised its full-year investment guidance floor to £2.3 billion from £2.2 billion. Severn Trent says its regulated asset base is expected to grow 14% to £17.6 billion by March 2027.
  • Positive Sentiment: Management reported £60 million of operating cost efficiencies so far this regulatory period and £250 million of capital efficiencies in AMP8, with a target of at least £150 million in operating efficiencies and £500 million in capital efficiencies over the period. It also cited energy hedges covering 90% of wholesale costs through 2030.
  • Positive Sentiment: Despite record heat and peak water demand 20% above seasonal norms, the company said it avoided usage restrictions and remained on track for leakage, supply interruption, spills, and pollution targets; it reported a 44% like-for-like reduction in pollution incidents.
  • Negative Sentiment: The investment program is not fully funded by operating cash flow: net debt rose to £10.8 billion as the company increased borrowing. Higher labor, regulatory fees, operating volumes, and investment-related costs also weighed on regulated profit, although efficiencies partly offset these pressures.
AI Generated. May Contain Errors.
Earnings Conference Call
Severn Trent H1 2027
00:00 / 00:00

Transcript Sections

Skip to Participants
James Jesic
James Jesic
CEO at Severn Trent

Hello, I'm James Jesic, Chief Executive of Severn Trent, and I'm delighted to be presenting our interim results today from a beautiful Draycote Water in Warwickshire. Draycote Water is a 240-hectare reservoir and country park that draws its water from the River Leam, which then supplies drinking water to Rugby and Coventry. 12 months ago, we started a GBP 10 million project to expand the capacity of the reservoir, and once complete, Draycote will be able to hold an additional 1.4 billion liters of water. That's enough for the 20,000 additional homes that will be built across Warwickshire over the next five years. This is just one of the ways we're investing to meet the growing demand for water in our region. A bit more on this later, but first, here are the highlights of a strong start to FY 2027.

James Jesic
James Jesic
CEO at Severn Trent

It's hard to imagine on this very cold November day, but we've just experienced one of the warmest and driest summers on record. During these periods, the demand for water increases, and we've seen demand peaks of 20% above the typical seasonal average. That means an extra 400 million liters of water a day, equivalent to supplying over 2 million people additional across the Midlands. Despite the demand and extended drought, our operational performance has been strong. We didn't introduce any restrictions, such as a hosepipe ban, and remain on track to meet supply interruption and leakage targets. Our environmental investment is delivering results too. Spills performance is on target, and total pollutions are down.

James Jesic
James Jesic
CEO at Severn Trent

So far this year, we've invested over GBP 1 billion across 2,000 projects in our region, and in August, we secured a further GBP 400 million of investment through the first round of reopeners. We have a very clear long-term investment plan across our region, and we will be applying the same disciplined approach to our year two of submission, which we will share in May, weighing up funding, returns, the timing of potential future regulator requirements, and of course, customer bills. On the subject of customer bills, we recognize the current cost of living challenge, so through our efficiencies, we'll be increasing the support in 2027 by a further GBP 25 million, taking the AMP total to GBP 600 million. This means around 250,000 additional households will receive a one-off credit of up to GBP 100.

James Jesic
James Jesic
CEO at Severn Trent

I've shared our investment case before, and we are delivering against this. Our largest-ever program supports resilience, long-term growth in our regulated asset base, and further opportunity from reopeners. The inflation-linked regulatory framework provides highly visible and predictable revenues and protection against cost pressures, with over half our total expenditure to 2030 protected from increases above CPIH. Our performance-led culture drives operational excellence and meaningful outcomes for customers. We really do have a strong track record of outperforming regulator incentives and consistently lead the sector on returns. All of this, of course, supports long-term earnings growth and an inflation-linked dividend. More from me shortly, but before that, I'll hand over to Helen to take you through our first-half financial performance.

Helen Miles
Helen Miles
CFO at Severn Trent

Thank you, James, and hello, everyone. We have delivered first-half PBIT growth of 13%, with adjusted earnings per share increasing by over 17% to GBP 1.188. The increase in PBIT reflects revenue growth of 7%, mainly from bill increases in our regulatory business. Infrastructure services added GBP 18 million of revenue as a result of acquisitions made in July last year, as well as growth in operating services and Green Power. Higher labor and regulatory fees increased operating costs in IRE, partly offset by lower hired and contracted spend and costs associated with HS2. Net finance costs rose by 5.6%, reflecting increased debt to fund our growing capital investment program. Capital investment increased by 37% to over GBP 1 billion. The regulated asset base will grow 14% to GBP 17.6 billion at March 2027, taking the total growth for the AMP to date to 28%.

Helen Miles
Helen Miles
CFO at Severn Trent

Our interim dividend is GBP 0.522 per share. Regulated PBIT has increased by 9% to GBP 510 million in the first half of the year. Core revenue grew by GBP 89 million, reflecting bill increases, including GBP 6 million from previously earned performance incentives. Bad debt as a percentage of household revenue remained flat at 2.1%, consistent with the previous year. We delivered GBP 23 million of efficiencies in the first half as a result of removing non-value-add activity, reducing unit cost per repair, and benefits from proactive investment. Rates, regulatory fees, and other levies increased by GBP 20 million, which is mostly business rates of GBP 10 million and standing charges in energy. Year-on-year price increases of GBP 8 million include fuel costs, pay inflation, and chemicals, offset by a lower hedged wholesale energy price.

Helen Miles
Helen Miles
CFO at Severn Trent

Higher operational volumes have increased by GBP 14 million, mainly driven by a higher number of leakage repairs as a result of the drought, as well as elevated energy and chemical consumption in waste as a result of tighter environmental outcomes at our waste treatment works. The increase in investment costs of GBP 24 million reflects GBP 14 million of additional depreciation due to our growing investment program, alongside increased spending on technology and people costs to deliver our plan. We have delivered a total of GBP 60 million of operating cost efficiencies so far this regulatory period, progressing towards our target of at least GBP 150 million by 2030.

Helen Miles
Helen Miles
CFO at Severn Trent

This has been achieved by removing non-value-add activities such as repeat work, and this year we have reduced the unit cost per job by 17% in water through greater use of no-dig solutions, and 7% in waste as a result of bringing more work in-house. Our proactive investment in water and waste networks means fewer major events, avoiding the cost of reactive responses and consequences of failure. The chart on the right shows that our rolling energy hedging program protects us against price increases. We secured wholesale prices at 46% below this year's average annual forecast market price and have hedged 90% of our wholesale energy price through to 2030. As we think ahead, we continue to invest for further efficiency. We are increasing our own energy generation. We currently self-generate around 62% of our energy consumption, and this will increase to 75% by 2030.

Helen Miles
Helen Miles
CFO at Severn Trent

Targeted investment in our waste and water sites, such as upgrading pumps and treatment equipment, will optimize our water and waste treatment processes, reducing energy use. Taken together, this relentless focus on driving cost efficiency gives us options to reinvest in future growth whilst managing the impact on customer bills and maintaining a strong balance sheet. We have GBP 2 billion in cash and undrawn committed facilities. This year, we renewed GBP 1.75 billion of bank facilities for five years and have increased our revolving credit facilities by GBP 550 million in the last 12 months. We have raised over GBP 400 million of new debt so far this year, priced at around 100 basis points below the regulatory allowance. Lower inflation on our index-linked debt reduced our effective interest costs by 30 basis points to 4.9% year-on-year.

Helen Miles
Helen Miles
CFO at Severn Trent

Regulated gearing is 63.8%, and we remain confident on our 60%-65% target range at the end of the AMP. Our debt mix remains well-balanced with over 60% of our debt at fixed rates. Both Moody's and Fitch have confirmed our credit ratings on a stable outlook this week. Turning to cash flow. In the first half, we generated GBP 656 million of operating cash flow. This does not fully fund our investment program, and we have supplemented this by increased borrowing, supporting our record investments of GBP 1 billion in the first six months of the year. Access to funding is essential to sustain that critical investment, and so we paid GBP 228 million in dividends to shareholders and net GBP 217 million interest to lenders, providing returns to the investors who supply our capital.

Helen Miles
Helen Miles
CFO at Severn Trent

As a result, group net debt increased to GBP 10.8 billion, supporting investment today in infrastructure that will serve customers and the environment for decades to come. We continue to generate regulatory returns, which are consistently higher than the rest of the sector. We have continued to deliver this under changing regulatory performance regimes. Strong operational performance, financing outperformance, and tight cost control underpin those returns. Since the introduction of performance incentives, we have consistently outperformed the sector by delivering outcomes that matter to customers across a broad range of measures covering water, waste, and the environment. Last year, we earned GBP 78 million in reward, while the sector averaged GBP 50 million in penalties. We consistently manage our costs carefully, and in the first year of this AMP, demonstrated our ability to deploy capital investment while managing our costs and protecting the base return.

Helen Miles
Helen Miles
CFO at Severn Trent

Base expenditure accounts for around 54% of our AMP8 plan, covering day-to-day service and asset maintenance. Enhancement spend includes investment to support growth in the number of customers we serve and improving outcomes for customers and the environment. As you can see from the chart on the left, which compares actual expenditure to the regulatory cost allowance in year one, we are broadly in line with our plan for both base and enhancement expenditure. This compares favorably to the sector, which has overspent on base by 12% and underspent on enhancement by 27%. This demonstrates our ability to manage our base running costs carefully and, at the same time, keep our enhancement investments on track. This is reflective of our differentiated delivery model. We have already delivered GBP 250 million of capital efficiencies this AMP, and the chart on the right shows how we have achieved this.

Helen Miles
Helen Miles
CFO at Severn Trent

Plug and play is reducing design and construction time through standardization and modular solutions on key components such as control panels and shaft tanks. In value engineering, our in-source design expertise, along with technology, helps us to refine project scope early to provide greater design confidence, enabling us to deliver projects sooner. Smart solutions optimize treatment processes and provide the data to target investment more precisely. Finally, through direct procurement, we are buying critical components such as pipes and valves directly from manufacturers, giving us much greater control over pricing and availability. AI is accelerating all of this progress. We have more than 70 AI initiatives underway across capital delivery and design, and we are using optioneering tools to reduce the time it takes to determine the best solution from over 30 weeks to just four weeks.

Helen Miles
Helen Miles
CFO at Severn Trent

We are now scaling these capabilities, and this is helping us deliver the growing program more efficiently. This will all contribute to delivering GBP 500 million of capital efficiencies this AMP. You can see our technical guidance for the remainder of this financial year and a summary of the outlook for the AMP. We have updated our capital investment guidance range to GBP 2.3 billion-GBP 2.5 billion from GBP 2.2 billion-GBP 2.5 billion, reflecting strong progress in the first half. All other guidance and outlook remains unchanged. Thank you for listening. I will now hand back to James.

James Jesic
James Jesic
CEO at Severn Trent

Thank you, Helen. I have established four key priorities for the business, and we are making good progress with tangible results across operations, investment, innovation, and customer service. I have already mentioned the record-breaking summer, and operationally, we have delivered significant increases in demand, avoiding any sort of restrictions on usage, and ensured performance on leakage, spills, and pollutions remained on track. We are efficiently executing the investment opportunity for long-term asset-based growth, delivering GBP 3 billion in capital projects in the first 18 months of this five-year business plan cycle, with 65% of the program already in contract. Our innovative approach using AI, standard products, and tailored delivery dependent on project scale and complexity has already realized GBP 300 million of efficiency to date. Importantly, we are seeing some early improvements for customers. We are making progress and have good momentum to deliver on these priorities.

James Jesic
James Jesic
CEO at Severn Trent

Getting customer service right means preventing service failures, resolving issues promptly when they do occur, and making sure we remove friction from our processes. We are seeing encouraging progress with billing complaints, and chase contacts for wastewater issues have improved. Customer engagement is also key to trust and the value placed on our service. This year, we held 40 customer sessions, ensuring we are raising awareness of our investment programs and reduce local concerns around disruption. This is key as our investment program expands. Our focus is on resolving issues faster, getting things right first time, and helping customers see the improvements their bills are contributing to in their local communities. Investment in our water networks continues to deliver benefits and incentives. For example, we expect to meet our leakage reduction target for the ninth consecutive year, delivering absolute reductions even as demand rises.

James Jesic
James Jesic
CEO at Severn Trent

Targeted investment over several years has strengthened our ability to maintain supplies. Now, 98% of our customers have access to a second source, and the mix of reservoirs, rivers, and aquifer abstraction gives us flexibility. Customers are also experiencing fewer interruptions. Average interruption duration is 29% lower year-on-year, and we remain on track to meet this year's regulatory target. Per capita consumption remains more challenging in the high-demand conditions we've seen over the last few years. Customer education, flow regulators, and smart meters will help modify consumption behavior and reduce demand. Our wastewater investment is delivering measurable environmental improvements. In January this year, the Environment Agency made a few changes to pollution classifications. For instance, pollutions previously classified as no impact are now included in the overall number.

James Jesic
James Jesic
CEO at Severn Trent

This will increase the total number of reported pollutions across the sector, but does not mean underlying environmental performance has deteriorated. On a like-for-like basis, we have reduced our total pollution incidents by 44%, and we have delivered around 100 environmental schemes early and have completed more than 3,200 spills interventions, including additional storage and increased treatment capacity. We've seen rainfall extremes too this year, with one of the wettest ever starts to the year, when rainfall in February reached 170% of average. But the interventions made mean we remain on track for our regulatory target of no more than 18 average spills per storm overflow in calendar year 2026. There is more to do to reach our ambition of fewer than 14 average spills by 2030, and improving resilience to climate extremes will be key to delivering this.

James Jesic
James Jesic
CEO at Severn Trent

Climate change is just one of the long-term drivers of growth in our region. The population is expected to grow by 12% by 2050, with 250,000 new homes being built every five years. That means expanding capacity for water supply, waste transfer, and treatment. Furthermore, tighter environmental standards, including further phosphorus reductions and statutory PFAS limits, will require new and complex treatment. Our focus is on having the capability to deliver this investment efficiently and reliably. We're well-positioned to do this, having insourced and diversified our capital delivery model over the last decade and accelerated over GBP 500 million of AMP8 projects into AMP7. We bring this to life in the short videos, as we take a closer look at the ways we're investing for customers and the environment to 2030 here in Warwickshire.

Video Narrator

Coventry in Warwickshire, the home of Shakespeare's birthplace and also home to over 600,000 Severn Trent customers. Over 23,000 new homes have been built in the county since 2020, with the population expected to grow by around a fifth by 2050. In 2026, Coventry and Warwickshire had both its second wettest winter on record and 44 days above 25 degrees. To help us manage these extremes, we're investing around GBP 450 million in more than 70 individual projects right across the county. At Rugby Newbold, we're investing GBP 16 million to expand capacity at our sewage treatment works, which will serve 38,000 more customers. We're installing a new GBP 15 million, 16 km mega pipeline that will link our underground reservoirs in Oldbury, Nuneaton, and Meriden, so it can move water more freely to where it's needed.

Video Narrator

We're also renewing around 200 km of Coventry and Warwickshire's water pipes, committing GBP 15 million to lay pipes that will serve future generations. We're increasing Draycote Water's capacity as part of a GBP 10 million project, so it can hold an extra 1.4 billion liters of water. We know that this essential investment has an impact on bills, so that's why we're talking to customers. Currently, over 30,000 households in the area receive some form of financial support from us. We've installed more than 120,000 smart meters across Coventry and Warwickshire to help customers manage their water usage, costs, and identify leaks. We've also pledged to improve 5,000 hectares for wildlife by 2027. As part of this, we're working with Warwickshire Wildlife Trust, alongside local farms and landowners, with our environmental protection scheme, STEPS, to create and rejuvenate over 6.5 km of hedgerows.

Video Narrator

We're invested in our people. Our purpose-built academy in Coventry now delivers around 200,000 hours of training across more than 600 courses annually. We're training new apprentices, graduates, and existing teams to deliver our plans and provide the best customer service. For our communities, our flagship Big Boost career event returned to the area for a fourth time. We met over 1,800 job seekers, connected them with local employers, and supported them with CV writing and interview skills. From infrastructure and biodiversity to developing new skills, we're investing in excellent service and a stronger future for all our customers across Coventry and Warwickshire.

James Jesic
James Jesic
CEO at Severn Trent

Over the years, we have really evolved our capital delivery model to help deliver our ever-growing program more efficiently, some of which Helen highlighted earlier. In AMP6, we relied on a small number of large design and build contractors. During AMP7, we brought design expertise in-house, giving us greater control over solutions, and we also diversified our supply chain to over 150 suppliers. In AMP8, we've extended that approach, establishing our own internal capability for water mains renewal, and acquired two suppliers covering water and waste. Standardization, plug and play, and AI-enabled design are increasing the use of repeated designs and solutions, and reducing the time to deliver, improving productivity. We believe there are even more opportunities ahead of us with our exciting AI developments that we have underway. We're already preparing for investment beyond 2030.

James Jesic
James Jesic
CEO at Severn Trent

We have launched our GBP 25 billion delivery and design framework, and already engaged with over 300 existing and prospective partners. Engaging early helps us secure the capability to deliver for up to the next 15 years and build on the greater control and flexibility we have today. Since the start of this regulatory cycle, we have invested GBP 3 billion spread across a broad program of projects, rather than concentrated on a handful of major schemes. We're already 27% through our mains renewal program and almost halfway through our 2030 smart meter installation target. The schemes are already providing additional clean water provision and expanding waste treatment capacity for the growing communities. Environmental outcomes are also being improved with enhanced effluent treatment, delivering further reductions in phosphorus, for example. These are just a few of the projects underway across our region.

James Jesic
James Jesic
CEO at Severn Trent

We're improving the service to customers that they rely on today, while building the capacity to serve growing communities and enhance the environment in the years ahead. Let me finish by showing what all these enhancements and investment mean for the long term. Regulatory capital value, or RCV, is the benchmark for the value of the regulated business. As investment increases, RCV grows, and from this platform, we can generate returns and create long-term value. This chart shows that whilst we have delivered RCV growth in previous regulatory periods, AMP8 represents a real inflection point for Severn Trent. By 2030, we will have more than doubled the value of our RCV in a decade. The current five-year record GBP 15 billion investment program already gives us 10% annual nominal RCV growth.

James Jesic
James Jesic
CEO at Severn Trent

The additional investment in Ofwat's reopener increases this to at least 10.3%, and of course, future reopeners and AMP9 transition spend provide further opportunities in this period. We're making real progress on delivery with much more ahead of us. Our focus is on turning that investment into lasting, resilient improvements for customers and the environment, and providing long-term value for shareholders. Thank you very much for listening.