LON:GRID Gresham House Energy Storage H1 2026 Earnings Results & Report GBX 108.50 -0.50 (-0.46%) As of 12:42 PM Eastern Gresham House Energy Storage reported H1 2026 earnings on September 23, 2026. The company reported EPS of -GBX 0.63. Research:ProfileEarnings HistoryForecast Earnings Announcement Details QuarterH1 2026Report DateSeptember 23, 2026TimeBefore Market OpensConference Call5:00 AM ET Gresham House Energy Storage EPS ResultsActual EPS-GBX 0.63Consensus EPS N/ABeat/MissN/AOne Year Ago EPSN/AGresham House Energy Storage Revenue ResultsActual RevenueN/AExpected RevenueN/ABeat/MissN/AYoY Revenue GrowthN/AConference Call ResourcesConference Call AudioConference Call TranscriptPress ReleaseInterim ReportEarnings HistoryCompany ProfilePowered by Gresham House Energy Storage H1 2026 Earnings Call TranscriptProvided by QuartrSeptember 23, 2026ShareShareShare This ReportLink copied to clipboard.Key Takeaways Positive Sentiment: NAV and earnings increased: NAV per share rose 15.8% to 131.3p, while first-half revenue grew nearly 10% to about £35 million and EBITDA reached £23.5 million. Management said growth reflected increased capacity and contracted agreements, with contracted revenues reaching 61% of the total. Positive Sentiment: Construction and development support the growth plan: Three projects totaling nearly 400 MW reached financial close and entered construction, targeting grid connection in the second half of 2027. A further 777 MW is under conditional acquisition, though Rayleigh is still awaiting its grid connection offer; management expects these projects to provide a further NAV uplift once financed. Negative Sentiment: Trading performance faced operational and market headwinds: First-half trading revenue was lower year over year, with outages—including assets offline for augmentation—and DNO maintenance reducing availability. Management also cited higher battery “skip” rates, which limit dispatch opportunities, and said improvements depend partly on grid-control changes and greater battery visibility. Positive Sentiment: Alternative revenues offer potential, but remain unproven at scale: Trials produced roughly £23 per MWh, but management cautioned that this may not be representative and is using lower assumptions. The revenue stream is not included in current valuations, with an initial 20 MW rollout targeted by year-end and a £25 million EBITDA ambition retained. AI Generated. May Contain Errors.Conference Call Audio Live Call not available Earnings Conference CallGresham House Energy Storage H1 202600:00 / 00:00Speed:1x1.25x1.5x2xThere are 2 speakers on the call. Operator00:00:01Good morning, everyone. We'll just give it 30 seconds just to allow people to join, and then we'll get going on this morning's presentation. Numbers still ticking up, so just bear with us for a minute or two. Okay, I think we'll get started. Good morning, everyone, and welcome to the interim results presentation for the Gresham House Energy Storage Fund, commonly known as GRID, for the six-month period ending 30th of June 2026. As always on these results presentations, delighted to be joined by Ben Guest, the Lead Fund Manager of GRID, and also accompanied this morning by Harry Hutchinson, a member of the investment team. Ben will present, together with Harry, for about 20 minutes, run through the presentation, and then we'll open it up to Q&As. Operator00:01:19Please send through any questions that you have as we go through the presentation, and we'll answer as many as we can in the time allotted. We'll aim to complete the presentation and Q&A by 10:45 A.M. this morning. It's been an exceptionally busy period for the company the first half of the year. Strong uptick in NAV as new projects move into the construction phase, work done on augmentations, and also further progress on alternative revenues, et cetera. On that note, I'm going to hand over to Ben. He'll go through the results in more detail, and then, as I say, we'll open up to Q&A, so please send your questions in. Ben, over to you, sir. Speaker 100:02:11Thanks, Rupert. Good morning, everyone. Pleased to be presenting the first half results for 2026. As always, please bear in mind our disclaimer slide. Just getting into the presentation right away, just some highlights in our executive summary page here. A period of healthy growth, a lot of activity, summarized by an NAV per share growing by 15.8% to 131.3p. It's not an all-time high, but it's making its way back. We showed some good revenue growth, rising almost 10% to close to GBP 35 million, and EBITDA outpacing this at GBP 23.5 million. This is driven by, obviously, increased capacity, and various contracted agreements coming into full effect, and in particular on the margin side, greater operational efficiencies, and I'll go into that detail. Speaker 100:03:10Just to highlight, and I'll repeat it two or three times through the presentation, contracted revenues are really increasing as a percentage of the total, representing 61% of the total in the first half. In terms of incremental activities, we're busy with our growth plan. Augmentations are well underway. We had two completed by the mid-year. We'll have probably all but one completed by the end of the year. We've added 152 MWh of battery capacity in the first half. On the new projects that are already now financed and in construction, we concluded a project-level project financing exercise. We raised equity against those projects at a premium to the carrying value of the project rights. The projects for completing this are Cockenzie, Monets Garden, and Elland 2, 240, 57, and 100 MW respectively. Speaker 100:04:08They are still on track to energize in the back half of 2027, with Monets Garden likely to come first. We have also, looking ahead to the incremental part of our growth plan, made conditional acquisition, signed SPAs for 777 MW of additional projects. That is Lister Drive, Ocker Hill, and Rayleigh, again, 57, 240, and 480 MW respectively. We are working hard to make these projects a reality in various different ways. The Rayleigh project is still waiting for its NESO Gate 2 offer to come back. It is still within the time frames expected, so there is no disappointment there at this stage, but we would look forward to seeing it as soon as possible, and hopefully, as soon as possible in Q1 of next year. Speaker 100:05:02Separate to that, Ocker Hill, one of our incremental projects for groundbreaking next year, which is a 240 MW project, we designed the project to also be capable of being 145 MW, so derated, at an eight-hour duration, given the space limitations on the site. It has been awarded what they call a minded-to contract by Ofgem. In other words, they intend to, I suppose, to give us a contract, and we then have to decide whether we accept the contract. There is quite a lot to think about in this context, and quite a lot we do not know yet, but hopefully we will know in the next couple of months. In terms of other highlights, we have mentioned the NAV per share rising. You can see the last three half-yearly periods, with a good trend emerging there. Speaker 100:05:57Hopefully, as we build new projects, and we will get into construction on new projects over the next year or so, we will see the incremental megawatts that I talked about, the close to 800 MW, impacting NAV per share in a similar way, proportionately speaking. Operational capacities at a record high, 1,072 MW, nearly 1.9 GWh or 1,853 MWh. Again, you can see the trend there. Megawatts have not increased this half year, but will do as the new projects start commissioning. Obviously, the augmentations are showing up in the megawatt-hour figure. Net debt and net debt to NAV remain within healthy limits. It has risen to GBP 171 million, the net debt, and the net debt to NAV has actually declined slightly this half year as the NAV has gone up. On the revenue perspective, growing and look forward to it growing further. Speaker 100:06:59The growth, as I mentioned, was driven by its general increase in underlying capacity. It has not been driven this half year by underlying improvements in revenue rates. Indeed, revenue rates have been hampered by assets being offline for augmentation. Glastonbury and Stairfoot, in particular, making up 90 MW, were offline for quite a long period. Also, we have seen DNO outages this summer, in the second quarter basically. An outage is basically there to either carry out scheduled maintenance or meaningful network upgrades, which require outages on our sites. So, we have seen more of that this year than previously, and that has had an impact as well. The next tile across is the contracted revenue. I have talked about that already. It is a significant percentage, and I will give some more color in a little bit. Then in terms of EBITDA margin, this is our best margin for some time. Speaker 100:08:00We do look forward to seeing further uplifts as we see more assets online. Naturally, a project that is offline has a zero to negative EBITDA margin for that period. So, there is scope to hopefully see improvements in that respect, as well as our endless focus on extracting costs, which we are seeing some success in as well. Just in more words, a bit more of what we have done. So we have added 152 MW in augmentations in the first half. We have got two augmentations that were completed in September, adding a further 54, and we have got two more targeting completion in October, adding a further 60. That will probably leave just Thurcroft augmentation to complete in the new year. Speaker 100:08:51In terms of new projects, as we mentioned, we have reached financial close and got into construction on Cockenzie, Elland 2, and Monets Garden, totaling nearly 400 MW, and targeting energization, in other words, a connection to the grid in the second half of 2027. In terms of the next three projects, which are larger, approaching twice the capacity of the current projects under construction, we are excited about these. They are all in England. They benefit from various network needs and therefore benefits from a cost perspective. Negative network charges, for example, the TNUoS or TNUoS charges are negative on the larger two of these two projects. Speaker 100:09:44We are into design, thinking hard about whether to make them long duration, and if longer duration than in the past, which they will be, almost certainly it is a question of how many hours against the megawatts, how long can they charge and discharge for. As I have mentioned, I have mentioned the long duration 92 contracts. As I mentioned also, there is a lot that we do not know yet in terms of how we will be expected to operate them, and what impact that would have positively or negatively on both technical degradation and obviously revenue levels. Just to highlight in the first half also, and we said this a few times, but useful to highlight again, that we struck a partnership with Summit Transition Partners, which is made up of Sumitomo and TPK in Taiwan. We are excited about this relationship and doing more on incremental projects with them. Speaker 100:10:41In terms of alternative revenues, have not mentioned anything yet. The trials that were started in December of last year concluded in the first half. We expect these revenues to add to and complement our existing revenue stack. I will come onto that in a little bit. In terms of getting going, there is a lot of activity in the background, really sort of honing and optimizing. As part of that, in the first half, we signed a route-to-market contract with a particular counterparty that enables us to do this at scale. Just to highlight also that alternative revenues are not included in valuations or in the NAV today at all. So hopefully we can start to show some movement there as well from a valuation perspective, as well as EBITDA. Just to sort of highlight what we did in the first half on the new projects. Speaker 100:11:38We closed a relatively complex financing across the three projects, bearing in mind that we cannot raise capital at the TopCo given discounts to NAV, a feature of investment trust companies' listing rules. So we raised senior debt of GBP 141 million, representing about 70% of the construction cost. We added some more debt on Kirk and Monets Garden, not LM2, to the tune of GBP 30 million in the form of an export credit facility, which was competitively priced. Then just to say that having done all this work and put in a process in place, this funding structure is absolutely repeatable. It is likely to be at the margin different in certain ways as we continue to seek to improve the way we do things. But it does lay the groundwork, and there will be a lot of similarities, I expect, between the current financing and future funding. Speaker 100:12:40This is all despite equity markets being closed. We were always pleased to be able to grow despite that. Just on alternative revenues, we used a similar slide at our Capital Markets Day, which we had in May, at which time we presented an iteration to our then called three-year plan. We are now calling it our growth plan. That growth plan was iterated to basically allocate capital more efficiently, to focus on more new capacity growth and less augmentations, because that was just more straightforward from an equity funding perspective and equity requirement. We said more about alternative revenues, which I will speak to now. These alternative revenues essentially add to our revenue stack and therefore diversify our revenue base. They are naturally inversely correlated to the merchant revenues that are generated by our core utility scale fleet, which obviously do better in high volatility environments. Speaker 100:13:45Obviously, alternative revenues do worse in high volatility environments. So there is a natural layering in of two sets of revenue streams. To be honest, we will not mind how they out-turn. We just like that in combination, they should contribute to lower volatility in revenues and to more revenues, of course, and more revenues per megawatt. We spent a lot of time back-testing this using historical data and back-casting, and obviously live trials as well, the most recent one ending in March of this year. At the bottom of the slide, you have got a timeline, a simple timeline, showing what we did in the trial, what we are targeting by year end, which hopefully will grow past during next year. Of course, we are still committed to our GBP 25 million EBITDA target for this area as part of our growth plan. Speaker 100:14:40I like this slide a lot, especially in terms of the story it tells. Obviously, the pie charts, or the donuts, do not show the growth that is stated there as 10% or 9.5% to be more accurate. But what it does show is if you look at the inner circles or inner donuts, you can see that the contracted share of revenues, as opposed to merchant, has grown significantly. This is a function of the tolls that we had in place initially and those rolling off into a greater proportion of the portfolio in terms of floor contracts. We have still got quite a few to roll onto. So, the contracted revenue base is looking healthy, which was the aim when we carried out our debt refinancing last year, ahead of the financing that I have mentioned already on the new projects this year. Speaker 100:15:32This all speaks to our existing portfolio. Within the contracted revenue base, we see capacity markets generating a higher percentage of revenues, partly as capacity market contracts roll on, partly, and it is a small part relatively speaking, due to inflation every year at the contract start date. The anniversary, which is October, capacity market contracts reprice upwards with CPI. The tolling is still there, but that will start rolling off and be replaced by floor contracts, and then exceeded by, and it will all become floor contracts in due course. When you look at the merchant piece, I think what is useful to look at there is what we have been talking about for a long time. Speaker 100:16:17If you look at the first half of last year, trading was over 50% of total merchant revenues, but frequency response, broadly categorized as an ancillary service, was still a meaningful part. In the first half of this year, trading really is starting to take over as the main business of the company. Trading is essentially trading volumes of energy, whether through the wholesale market or making ourselves available to the control room, as opposed to responding to very short-term signals, variations in the frequency, precisely speaking, that trigger the import or export of power that cannot be traded because it is too live, too real-time, and it is naturally a smaller part of the market. This next slide, it goes through the NAV per share. We are very pleased with this outcome. Naturally, this eventually translates into EBITDA growth. The NAV at the end of last year was 113.3. Speaker 100:17:19The roll-forward effect is a combination of shorter lives on some projects, although others have long lives, but we do cap everything at 30 years, even if we own the land. Naturally, if projects are getting shorter, that would mean a negative roll-forward effect. Two other things take it positive. We have got certain fallow periods, for example, assumed for augmentations start to disappear. Naturally, because we have got upward-leaning revenue curve forecasts, you are heading towards that higher ground, at least from a NAV perspective, and it has a small effect to the positive. The next bar is much more meaningful. It is the revaluation of our incremental projects to fair value. The three projects that I mentioned are Cockenzie, Monets Garden, and Elland 2. These are now valued on a DCF basis and having IRRs in excess of the weighted average discount rate. Speaker 100:18:19Given the fact that there is a lot of megawatts involved here, and there will be just a highlight even more next year with the next phase of projects, it has a big effect on the NAV. Other updates are relatively small from construction costs and other things, and timings as well is another factor within the construction update. Revenue forecasts, small overall impact in terms of how we have done this. We will come onto that in a second, and operating costs. Net fund and SPV working capital is essentially cash flow from the projects. Operational debt costs are the debt servicing within the portfolio, and then you have got a mark to market on the interest rate swaps leading to 131.3. Speaking to the curves now, here you have got a typical chart that we have used many times before of the one hour in light blue or teal. Speaker 100:19:18Yellow is an hour and a half, and two hours is the dark blue. What we have done this period, and it is important to share, is the dashed line is the previous period. In other words, the end of 2025 curve. Most of the solid line is the new forecast, which over the longer term has headed higher. The actual forecasts that we received were the small dotted lines between now and 2030. The manager, with the board and its advisors, have decided to reset that front end, which would have, if taken on board, led to a significantly higher increase in NAV this period, and set the curve at the front end to essentially be a relatively straight line between current trading environment and 2030s third-party curve level, and it is effectively interpolated between the two. Speaker 100:20:25The rationale for that is, it makes little sense to assume third-party curves at the levels shown when actual trading is at the levels where we have reset them. For want of a better or more scientific approach, we have interpolated between the two. We assume 2030 simply because we thought that was a sensible timeframe to see essentially the underlying causes for these curves to be essentially over-optimistic in our opinion, namely skips, having a chance to come down certainly by 2030. The final point on this slide onto the right here is that the weighted average discount rate remained at a similar level to the past, which is 10.9%. Before going into conclusions, this is a sort of a market slide. We continue to be somewhere in the teens, at 14% of the market. It is a rapidly evolving market, but not exclusively. Speaker 100:21:25We are still the largest. Zenobē and Statera, if you have studied these charts before, have been there for a long time. A new entrant has been Copenhagen Infrastructure Partners with a meaningful new project at 500 MW. Voltwise, which bought SMS plc's assets and is growing itself, is shown there as well. You have Foresight here, who acquired Harmony's assets. It is still a relatively small field, I think is a key point to highlight. There will be one or two emerging players. In particular, Fidra Energy is building a large project at Thorpe Marsh and another one as well. They are expected to be a large operator. They are backed by EIG and the National Wealth Fund. But other than that, it is a pretty small overall playing field in the U.K., by number. Speaker 100:22:19In terms of highlights, driving value from our operational base is a key focus, and between financings, we have more time to do this. We are obviously growing our team as well, and we are finding ways of incrementally adding revenues or incrementally taking cost out, and we look forward to reporting more on that at the next stage, whether it is at Q3 or full year, remains to be seen. But we are excited about how much cost we can take out of the business by doing things in innovative ways. Again, more details on that in the future. The following bullets are mainly about the growth plan, augmentations, adding 198 MWh of capacity. We are heading towards two hours very quickly. We are at just under 1.8 hours now. It is nice to see that. It has a positive impact on revenues. Speaker 100:23:11We're under construction on the incremental three projects, nearly 400 MW, with energization in the back half of next year. We're progressing well on the development and progressing to construction readiness on the incremental 777 MW, even if we are still waiting for the Rayleigh grid connection offer to come back. We're evaluating design and, in particular, duration very closely. There's a lot of new battery offerings to serve that part of the market now emerging as well, which is very interesting to look at. Scaling up alternative revenues, we remain very excited about this area. We're honing our strategy and look forward to providing further updates with an initial step of 20 MW by the end of this year in terms of what we're reporting and committing to. That's it. With that, I'll go back to Rupert. Thank you. Operator00:24:14Ben, thank you. Informative as always. Again, if any of the audience would like to ask a question, please send those in online. We have three or four here, so we can kick off while others want to add to the list. Ben, first question, are you seeing any changes in battery technology coming to sufficient maturity that you'd start to consider them for the company? Speaker 100:24:46Starting to, and the only one we're starting to see is sodium-ion. The technology has various benefits and various drawbacks. Today, it's still more expensive than lithium-ion, so we're very unlikely to buy it. It has also less density, so it takes up more room. On the flip side, it's considered and is safer. The likelihood of thermal runaway is smaller. Sodium is more abundant, so the likelihood is that once it gets and competes with lithium successfully, is that the bill of materials there will end up lower, and it may completely take over in due course. It's easier to measure its state of charge, so you can use the battery more fully. Doesn't go to degradation necessarily, but it goes to potentially revenues. There's a few other features. Speaker 100:25:44Sodium-ion is the only one that is being heavily backed also by the Chinese manufacturers as well. CATL have announced a product in this area, so I would expect a big push from the manufacturers in this area, and it would be interesting to see the world not dependent on lithium for stationary batteries. I suspect the density is not good enough for car batteries, although you may see hybrid batteries, because sodium also operates well at a wider temperature range as well, so that could be good for many uses. Operator00:26:20Thank you. Trading revenue in H1 2026 were lower than the same period last year. Can you comment on reasons? The wholesale electricity price was negative on eight occasions in September to date, while high on average overall. How has this impact recent trading? Speaker 100:26:46First half trading and recent trading. Operator00:26:49Yeah. Speaker 100:26:50The first half was generally flatter. We saw an uptick in skip rates for batteries. I will come onto that in a second. Slightly flatter markets or flatter markets at certain times. I mean, there were certain months that were pretty volatile, but overall, there were some also weaker months. Overall market conditions were a bit tougher. But within our portfolio, what has really impacted things is uptime. As I mentioned, our Glastonbury project, which was 50 MW, was off and not really generating until well into Q2. We had Stairfoot, which was off, I cannot remember exactly how long, but two to three months. That is 40 MW, and that is basically 4% of the portfolio. We did have one other asset that was offline for technical reasons, for which we have made a business interruption insurance claim, and that gap will probably be filled in with that. Speaker 100:27:55It was not our site that was at issue, it was the network. There is a handful of factors that led to lower uptime as well. The last factor being DNO outages. We are connected to distribution network operators, or DNOs for short, across our current fleet. And they need to sometimes do, and usually just during the better months of the year, tend to take assets offline, like ours, which they are allowed to do to either reinforce the network or do scheduled maintenance, and we saw quite a lot of that this year. There is that. Then in terms of the skip rate point, it impacted in particular in Q2 and into Q3 a bit. Speaker 100:28:44The very hot months that we've seen has led to some press on this as well, but the control room needing to be more cautious about how extreme certain scenarios might be in any half-hourly period. In other words, might we see certain gas plants go offline suddenly? Might we see even nuclear plants go offline in 40-degree heat, et cetera, et cetera? You've got sort of unknown decreases in behind-the-meter generation because of the 2 million rooftops we've got in this country, which keeps going up. We've got EV charging profiles starting to make a dent in terms of what happens on the network. General caution was introduced in the control room, and that means that they need more of the flex that's available to them. That's made up of batteries, pumped storage hydro, gas, and at the margin, even generating assets like Drax's biomass asset. Speaker 100:29:46The ones that need scheduling soonest, for whatever reason, even if they're more expensive, are basically use-them-or-lose-them technologies. They're basically either you use them or you then don't have them available to you. In a more cautious environment, you have more of those used, and the outturn might still not be that bad, but you've dealt with a, you've mitigated a potential situation. But it does mean that the batteries are forced to compete in a reduced pot because privileged access in that context has been given to the less efficient technologies. That's the core of the skip rate issue, and it's made worse when risk management and caution increases in the control room. This is where the argument lies around how high skips should be. Speaker 100:30:36Over the next few years, we will see, we do expect anyway, given that half the gas fleet is over 30 years old, 15 over 30 GW approximately, we do expect them to either be offline a lot more or just go offline permanently at end of life, and batteries will increase. Naturally, the skip rate issue should start diminishing as the overall mix of flexible assets just tends towards being more batteries. But this is a big factor and one of the factors why trading revenues were weaker in the first half. Operator00:31:10Thank you, Ben. Any updates on NESO control room? Speaker 100:31:16Yes. There's always a dialogue going on. I've just spoken to the risk management point and the need to address sort of relative extreme situations and taking a sort of mid-winter approach to managing the network in the middle of the summer, essentially. That's one thing. Probably the most incrementally significant one, specifically for batteries, is what we've called before GC0166. That's the sort of grid code modification that was consulted on for years in the end. It's much slower than expected, but was approved by Ofgem in September of last year. We'd hoped that this would result in batteries becoming fully visible to the control room by the middle of this year at the latest. Speaker 100:32:10That's been pushed back to early November, simply to make sure that the information that needs to be provided to NESO, both the type and how frequently it needs to be provided, is plugged in and basically onboarded all the assets, all the many over 100 battery assets that exist across the country are correctly onboarded onto the Balancing Mechanism system, which requires Elexon, which is the clearing house subsidiary of NESO. That, when it does come online, we do hope will have a meaningful impact because in those instances where NESO has to say, "Well, we need as much flex as possible or allow for more flex because we don't know what the extreme environment might be," because of the reasons I gave earlier, but outages of generation plants is a big one. Speaker 100:33:10By then, they will be able to see, "Oh, gosh, we've got a lot more battery capacity than we expected because so far we've been assuming 30 minutes worth. We've actually got two hours in that one," and so on. We don't need to be quite as cautious in terms of using less efficient technologies. We can let them go and focus more on batteries, which are basically cheaper, and start to see better utilization of batteries on the back of that. That's certainly what's been indicated by NESO. Operator00:33:45Thank you. Can you comment on dividend policy over the next two to three years? Speaker 100:33:55This is, if I may pass the buck, is a board matter. Operator00:33:59Sure. Speaker 100:33:59The board is planning to give an update. They have committed to this at some stage, I think before the end of the year. I can't remember exactly the timing. Apologies. There's a commitment to do so. If you do listen to RNS messages from the last few quarters, however, we have indicated that there's a wish to grow this company, that there's a sort of energy transition going on here, and there's a wish to recycle capital. I won't say more now. Fundamentally, this business is set up to provide a balance between income and capital growth as well. Operator00:34:35Yeah. Okay. I suspect there are also parts of this question or next questions that you can answer and those that probably are best parked. Anyway, let me just read them out. When do you expect the new 777 MW to be included in NAV at DCF rather than cost? Is this likely to be the next big NAV boost? Speaker 100:34:59To the second part of the question, yes, it is. Operator00:35:01What is the approximate revenue per megawatt from the alternative revenues? How fast can you ramp this up? Speaker 100:35:11Okay, got it. There's two parts to the question there. On the incremental 777- Operator00:35:15Yeah Speaker 100:35:17We will revalue them at the quarter end following financial close. That might be staggered in the end. We will see. Operator00:35:24Yeah. Speaker 100:35:25Hoping we can do it as one financing, but if it needs to be staggered because Rayleigh's a bit behind or something else, it will be staggered. That will be a meaningful impact and very round numbers. You could probably go, "What was the uplift per megawatt - Operator00:35:41Yeah Speaker 100:35:42this quarter?" And say something vaguely similar for these assets incrementally as well, subject to- Operator00:35:49But a 2027 rather than 2026. Speaker 100:35:51Correct, yes. The timing of that will be 2027. Operator00:35:54Yeah. Speaker 100:35:55Most likely Q3 or Q4. In terms of alternative revenues, we have highlighted that the GBP per megawatt hour achieved in the trial was in the region of GBP 23. We need to see this strategy operate in more different backdrops and a larger scale before we commit to, or we just start to report the actual numbers. GBP 5-GBP 10 is what we have indicated, which is similar to the level of revenues that we are earning from the existing fleet today. It is scalable across probably approaching 50% of our megawatts, hopefully relatively cautiously. There is a lot to go for here. I do not want to make any new- Operator00:36:45Sure Speaker 100:36:45forecasts or commitments on behalf of the company now, but we do stick and stand by our GBP 25 million EBITDA target. Operator00:36:54Okay. Outside of your alternative revenue strategy, are you using different optimizers for your various sites or just one? Speaker 100:37:04Sorry, was this alternative revenues or something else? Sorry. Operator00:37:06No, outside of alternative revenues. So, yeah. So, really a question around how many optimizers do we use? Speaker 100:37:12Yeah, absolutely. We've got five or six different optimizers across the fleet. The majority of the floors are, this is all public information, of the actual floors are with EDF and Statkraft. We have an effective floor through essentially an ISDA with an insurance company for a significant portion of the rest. Operator00:37:42Okay. What specifically needs to happen between now and 2030 for revenues to converge with the third-party forecasts? Speaker 100:37:56Very good question. When you look at the macro, you can almost dare to get a bit excited because you've got growing electricity demand, you've got a couple of nukes coming offline, you've got Drax generating less power as well. That's a commitment that's made that kicks in Q2 next year, I think, if I remember rightly. That's a huge asset. It's going to overall generate half the output that it has done to date, somewhere close to 4 GW. So we've got demand increasing, we've got supply, especially dispatchable base load-like supply decreasing, and we've got a huge growth to fill in that gap in renewable generation, such that it's likely to take renewable generation from 40-something percent to over 80% in the next four or five years. Speaker 100:38:51All of that translates into a very, very much more volatile environment, with the bottlenecks and constraints that exist in the network still remaining a serious problem, even if lots of money is being spent to increase the amount of power that can flow at those constraints. You see all of that. You see the likelihood that the gas assets that mostly behave like peakers these days with flexible generation, I expect a proportion of those, potentially a fairly large proportion, as I mentioned earlier, potentially half, given that half are over 30 years old now, starting to go offline or having more issues. Speaker 100:39:35So really, it means that batteries go from one of the smaller sources of flexibility, especially given the shorter duration of the fleet, to a much larger proportion of peak megawatts and the amount of time that they can operate for, and therefore megawatt hours or gigawatt hours. All of that gives a good reason why the overall curve should be heading higher from a macro perspective in the absence of skips. The other very important thing that we need, though, is a reduction in skip rates. Because at the moment, if you have got the control room purely to manage risk, it has to turn certain assets on first, whether that is dispatching or scheduling interconnectors, pumped storage hydro, gas assets, potentially Drax's biomass asset, and so on. Turning all those on or having them available first and therefore prioritized, it naturally means that batteries are left to last. Speaker 100:40:35As we get more visibility of batteries, as we have many more batteries as a percentage of total flex, that effect should decrease. Hopefully, I do think another thing that needs to happen, which I am less confident about, is the amount of automation and computer intelligence to help in those scenarios as well. But the combination of all these things, processes, mix of flex, and in particular, the growing percentage of batteries, and technology and also computing power in the control room should all contribute to all the flexible market being available to batteries, not just what remains after other assets have been prioritized. That is what is needed. Operator00:41:25Thank you, Ben. Another question on the alternative revenues. Speaker 100:41:29Okay. Operator00:41:29Specifically around what the trials have achieved in terms of The trials have significantly beaten the 5-10 MWh you are using to get to the GBP 25 million. Can you explain why you expect this to be so much lower than the 23 MWh you have seen in the trials? Speaker 100:41:56I certainly can explain it. I am just trying to word it in a useful way while also not disclosing anything we do not want to disclose. But essentially, we are extracting a margin, essentially between the price that can be captured at spot by batteries and somewhere in the towards the end market, without giving that away. Operator00:42:27Yeah. Speaker 100:42:27That margin can vary significantly according to the amount of renewable generation on the system. During the trial period, there was quite a lot of wind, so you have to be cautious about where the outturn is. Having said that, without changing our forecast or assumptions, given that we are heading from 40-something percent, 45-odd percent wind and solar in this country to 80%, we do expect the amount of time that renewables together generate significantly more than might be expected from them to grow, that having a favorable impact on wholesale prices. Let us see how everything pans out, but we do have to be cautious here just because Operator00:43:24Yeah Speaker 100:43:24one time, a short period. Operator00:43:26Sure. What is the impact on the BESS market from higher gas prices as a result of the Iran war? Are we seeing a rerun of the Ukraine war impact? Speaker 100:43:40The gas price is in the foothills of the Everest share price shape that we not share price, gas price shape that we saw between 2021 and 2024, I suppose. But it is at multi-year highs now, and it absolutely increases volatility in the market, and we are seeing that now. Sorry, I do not think I spoke to the recent trading question earlier. Operator00:44:06Yeah. Speaker 100:44:07It gives me a second chance. If you look at the Modo Index or BESS Analytics or any other platform that shows recent trading, we are close to highs for the year. Operator00:44:22Thank you. Speaker 100:44:22In terms of volatility. Operator00:44:23Yeah. Can you explain why balancing revenues are negative, and what needs to happen to get this to turn positive again? Speaker 100:44:35I do not know what is meant by balancing revenues being negative. I am going to guess that that is looking at the BESS Analytics Operator00:44:42Yeah Speaker 100:44:42portal. I do not know exactly how they construct this, but my guess is that there is an assumption in that model that assumes that you only charge in the Balancing Mechanism, only export in the wholesale, or largely do that. That means that you are only incurring costs in the Balancing Mechanism rather than doing more balanced trading in terms of importing and exporting in the Balancing Mechanism. But the overall line that goes through the overall chart, that is the sum of everything, is what we need to look at and is the number that is heading higher. Hopefully, that is useful to the person who asked. Operator00:45:18Okay. Speaker 100:45:19I can say something offline if they want, of course. Operator00:45:21Thanks, Ben. There are a couple of questions here around PrimeStone and the dialogue there. I think, look, a couple of comments there. I speak on behalf of the manager, Gresham House, here, and as a colleague of Ben's and Harry's. Our goal is to maximize shareholder value from delivering on our growth strategy. I think the manager's been very clear on that. Obviously, the board have had a number of constructive dialogues with PrimeStone. There have been various RNSs released, which have obviously been seen by everyone. I think that there's a common goal here, which is to see a higher share price, see a reduction in the NAV discount, and to maximize returns for all shareholders. I think getting into any discussion or debate beyond that doesn't serve any purpose here. Operator00:46:29Suffice to say that I know that the board and its advisors will continue to have a dialogue with PrimeStone, as well as all other shareholders who they have consulted over recent weeks and months. We, as the manager, will be involved as and when the board deem it appropriate. In the meantime, we will continue to have a laser focus on driving and maximizing shareholder value. Speaker 100:46:58Nothing to add. Operator00:47:02I think, Ben, that's all the questions that we've had from the audience. I think we are obviously at 10:45, 10:47, so I think we'll close the formal session there. I'd like to thank everyone for attending this morning's presentation. Ben and Harry, thank you for your contributions as ever. Thank you to all our shareholders for their patience and support over the last 18 months as we've been on this recovery journey. I think the team continue to innovate, continue to execute, and as I say, remain absolutely laser-focused on driving and maximizing shareholder value. If anyone has any further questions or would like to follow up directly with the manager, we'll obviously be delighted to do so. In the meantime, thank you again for attending this morning, and hopefully see everyone soon. Thank you. Speaker 100:48:13Thank you.Read morePowered by Earnings DocumentsPress ReleaseInterim report Gresham House Energy Storage H1 2026 Earnings FAQ Did Gresham House Energy Storage beat earnings estimates for H1 2026? Gresham House Energy Storage (LON:GRID) reported earnings of -GBX 0.63 per share for H1 2026. The report was announced on Wednesday, September 23, 2026. Where can I read Gresham House Energy Storage's H1 2026 earnings call transcript? The full Gresham House Energy Storage H1 2026 earnings conference call transcript is published on this page, including prepared remarks and the analyst Q&A session, along with the participants who spoke on the call. Gresham House Energy Storage Earnings HeadlinesGresham House Energy Storage U-turns on sale after activist pressureNovember 3, 2026 | lse.co.ukGresham House Energy Storage Fund to Launch Formal Sale ProcessNovember 3, 2026 | marketscreener.comMThe investigation Porter spent tens of thousands to documentPorter Stansberry flew the Porter and Co. team 3,300 miles to Dublin to investigate a 17-year investing experiment called Project Prophet - and documented everything on film. Rooted in the laws of physics, this quantitative approach challenges conventional wealth-building wisdom. With 17 years of verified data behind it, Porter calls it unlike anything he has seen in nearly 30 years in the business.November 17 at 1:00 AM | Porter & Company (Ad)Gresham House Energy Storage Fund plc Launches A Formal Sale ProcessNovember 3, 2026 | marketscreener.comMGresham House Energy net assets up following 397MW revaluationSeptember 23, 2026 | marketscreener.comMInterim Results for period ended 30 June 2026September 23, 2026 | markets.ft.comSee More Gresham House Energy Storage Headlines Get Earnings Announcements in your inboxWant to stay updated on the latest earnings announcements and upcoming reports for companies like Gresham House Energy Storage? Sign up for Earnings360's daily newsletter to receive timely earnings updates on Gresham House Energy Storage and other key companies, straight to your email. Email Address About Gresham House Energy StorageGresham House Energy Storage (LON:GRID) Fund plc (GRID or the Fund) seeks to capitalise on the growing intraday supply and demand imbalances caused by Great Britain’s ever increasing reliance on renewable energy. The Fund aims to provide investors with an attractive and sustainable dividend by investing in a portfolio of utility-scale Battery Energy Storage Systems (BESS) located in Great Britain, which primarily use batteries to import and export power, accessing multiple revenue sources available in the power market. Gresham House Asset Management Limited (GHAM), is the investment Manager for Gresham House Energy Storage Fund plc. GHAM, the operating business of Gresham House plc (GHE), a London Stock Exchange quoted specialist asset manager, manages funds and co-investments across a range of differentiated alternative investment strategies for third-party clients. The company is built around a long-term investment philosophy and applies private equity techniques to due diligence and investment appraisal.View Gresham House Energy Storage ProfileRead more More Earnings Resources from MarketBeat Earnings Tools Today's Earnings Tomorrow's Earnings Next Week's Earnings Upcoming Earnings Calls Earnings Newsletter Earnings Call Transcripts Earnings Beats & Misses Corporate Guidance Earnings Screener Latest Articles Amazon’s Black Friday Rush Could Kick Off a Holiday Season That Defines Its YearThe Next Nuclear Opportunity May Be in Fuel, Not Reactors: 3 Stocks to WatchTyson Foods' Earnings Beat Hides a Warning for Consumer Staples Dividend InvestorsMongoDB's Biggest Advantage May Be GitLab's Biggest WeaknessMicrosoft's Outage Barely Moved Its Stock, But a Bigger Risk May Be BuildingTyson Foods' 10% Surge Puts a Breakout in Sight, But Wall Street Remains CautiousOndas Is Building a Defense Growth Engine, But Can It Deliver on Its Backlog? Upcoming Earnings Lowe's Companies (11/18/2026)TJX Companies (11/18/2026)Target (11/18/2026)Palo Alto Networks (11/18/2026)NetEase (11/19/2026)Alibaba Group (11/19/2026)PDD (11/19/2026)Ross Stores (11/19/2026)Walmart (11/19/2026)Intuit (11/19/2026) Unlock superior investment research and tools. Sign up for MarketBeat All Access to gain access to MarketBeat's full suite of research tools and reports. Get MarketBeat All Access MarketBeat All Access Features Best-in-Class Portfolio Monitoring Get personalized stock ideas. Compare portfolio to indices. Check stock news, ratings, SEC filings, and more. Stock Ideas and Recommendations See daily stock ideas from top analysts. Receive short-term trading ideas from MarketBeat. Identify trending stocks on social media. Advanced Stock Screeners and Research Tools Use our seven stock screeners to find suitable stocks. Stay informed with MarketBeat's real-time news. Export data to Excel for personal analysis. Sign in to your free account to enjoy these benefits In-depth profiles and analysis for 20,000 public companies. Real-time analyst ratings, insider transactions, earnings data, and more. Our daily ratings and market update email newsletter. Sign in to your free account to enjoy all that MarketBeat has to offer. Sign In Create Account Your Email Address: Email Address Required Your Password: Password Required Log In Email Me a Login Link or Sign in with Facebook Sign in with Google Forgot your password? Your Email Address: Please enter your email address. Please enter a valid email address Choose a Password: Please enter your password. Your password must be at least 8 characters long and contain at least 1 number, 1 letter, and 1 special character. Create My Account (Free) or Sign in with Facebook Sign in with Google By creating a free account, you agree to our terms of service. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
There are 2 speakers on the call. Operator00:00:01Good morning, everyone. We'll just give it 30 seconds just to allow people to join, and then we'll get going on this morning's presentation. Numbers still ticking up, so just bear with us for a minute or two. Okay, I think we'll get started. Good morning, everyone, and welcome to the interim results presentation for the Gresham House Energy Storage Fund, commonly known as GRID, for the six-month period ending 30th of June 2026. As always on these results presentations, delighted to be joined by Ben Guest, the Lead Fund Manager of GRID, and also accompanied this morning by Harry Hutchinson, a member of the investment team. Ben will present, together with Harry, for about 20 minutes, run through the presentation, and then we'll open it up to Q&As. Operator00:01:19Please send through any questions that you have as we go through the presentation, and we'll answer as many as we can in the time allotted. We'll aim to complete the presentation and Q&A by 10:45 A.M. this morning. It's been an exceptionally busy period for the company the first half of the year. Strong uptick in NAV as new projects move into the construction phase, work done on augmentations, and also further progress on alternative revenues, et cetera. On that note, I'm going to hand over to Ben. He'll go through the results in more detail, and then, as I say, we'll open up to Q&A, so please send your questions in. Ben, over to you, sir. Speaker 100:02:11Thanks, Rupert. Good morning, everyone. Pleased to be presenting the first half results for 2026. As always, please bear in mind our disclaimer slide. Just getting into the presentation right away, just some highlights in our executive summary page here. A period of healthy growth, a lot of activity, summarized by an NAV per share growing by 15.8% to 131.3p. It's not an all-time high, but it's making its way back. We showed some good revenue growth, rising almost 10% to close to GBP 35 million, and EBITDA outpacing this at GBP 23.5 million. This is driven by, obviously, increased capacity, and various contracted agreements coming into full effect, and in particular on the margin side, greater operational efficiencies, and I'll go into that detail. Speaker 100:03:10Just to highlight, and I'll repeat it two or three times through the presentation, contracted revenues are really increasing as a percentage of the total, representing 61% of the total in the first half. In terms of incremental activities, we're busy with our growth plan. Augmentations are well underway. We had two completed by the mid-year. We'll have probably all but one completed by the end of the year. We've added 152 MWh of battery capacity in the first half. On the new projects that are already now financed and in construction, we concluded a project-level project financing exercise. We raised equity against those projects at a premium to the carrying value of the project rights. The projects for completing this are Cockenzie, Monets Garden, and Elland 2, 240, 57, and 100 MW respectively. Speaker 100:04:08They are still on track to energize in the back half of 2027, with Monets Garden likely to come first. We have also, looking ahead to the incremental part of our growth plan, made conditional acquisition, signed SPAs for 777 MW of additional projects. That is Lister Drive, Ocker Hill, and Rayleigh, again, 57, 240, and 480 MW respectively. We are working hard to make these projects a reality in various different ways. The Rayleigh project is still waiting for its NESO Gate 2 offer to come back. It is still within the time frames expected, so there is no disappointment there at this stage, but we would look forward to seeing it as soon as possible, and hopefully, as soon as possible in Q1 of next year. Speaker 100:05:02Separate to that, Ocker Hill, one of our incremental projects for groundbreaking next year, which is a 240 MW project, we designed the project to also be capable of being 145 MW, so derated, at an eight-hour duration, given the space limitations on the site. It has been awarded what they call a minded-to contract by Ofgem. In other words, they intend to, I suppose, to give us a contract, and we then have to decide whether we accept the contract. There is quite a lot to think about in this context, and quite a lot we do not know yet, but hopefully we will know in the next couple of months. In terms of other highlights, we have mentioned the NAV per share rising. You can see the last three half-yearly periods, with a good trend emerging there. Speaker 100:05:57Hopefully, as we build new projects, and we will get into construction on new projects over the next year or so, we will see the incremental megawatts that I talked about, the close to 800 MW, impacting NAV per share in a similar way, proportionately speaking. Operational capacities at a record high, 1,072 MW, nearly 1.9 GWh or 1,853 MWh. Again, you can see the trend there. Megawatts have not increased this half year, but will do as the new projects start commissioning. Obviously, the augmentations are showing up in the megawatt-hour figure. Net debt and net debt to NAV remain within healthy limits. It has risen to GBP 171 million, the net debt, and the net debt to NAV has actually declined slightly this half year as the NAV has gone up. On the revenue perspective, growing and look forward to it growing further. Speaker 100:06:59The growth, as I mentioned, was driven by its general increase in underlying capacity. It has not been driven this half year by underlying improvements in revenue rates. Indeed, revenue rates have been hampered by assets being offline for augmentation. Glastonbury and Stairfoot, in particular, making up 90 MW, were offline for quite a long period. Also, we have seen DNO outages this summer, in the second quarter basically. An outage is basically there to either carry out scheduled maintenance or meaningful network upgrades, which require outages on our sites. So, we have seen more of that this year than previously, and that has had an impact as well. The next tile across is the contracted revenue. I have talked about that already. It is a significant percentage, and I will give some more color in a little bit. Then in terms of EBITDA margin, this is our best margin for some time. Speaker 100:08:00We do look forward to seeing further uplifts as we see more assets online. Naturally, a project that is offline has a zero to negative EBITDA margin for that period. So, there is scope to hopefully see improvements in that respect, as well as our endless focus on extracting costs, which we are seeing some success in as well. Just in more words, a bit more of what we have done. So we have added 152 MW in augmentations in the first half. We have got two augmentations that were completed in September, adding a further 54, and we have got two more targeting completion in October, adding a further 60. That will probably leave just Thurcroft augmentation to complete in the new year. Speaker 100:08:51In terms of new projects, as we mentioned, we have reached financial close and got into construction on Cockenzie, Elland 2, and Monets Garden, totaling nearly 400 MW, and targeting energization, in other words, a connection to the grid in the second half of 2027. In terms of the next three projects, which are larger, approaching twice the capacity of the current projects under construction, we are excited about these. They are all in England. They benefit from various network needs and therefore benefits from a cost perspective. Negative network charges, for example, the TNUoS or TNUoS charges are negative on the larger two of these two projects. Speaker 100:09:44We are into design, thinking hard about whether to make them long duration, and if longer duration than in the past, which they will be, almost certainly it is a question of how many hours against the megawatts, how long can they charge and discharge for. As I have mentioned, I have mentioned the long duration 92 contracts. As I mentioned also, there is a lot that we do not know yet in terms of how we will be expected to operate them, and what impact that would have positively or negatively on both technical degradation and obviously revenue levels. Just to highlight in the first half also, and we said this a few times, but useful to highlight again, that we struck a partnership with Summit Transition Partners, which is made up of Sumitomo and TPK in Taiwan. We are excited about this relationship and doing more on incremental projects with them. Speaker 100:10:41In terms of alternative revenues, have not mentioned anything yet. The trials that were started in December of last year concluded in the first half. We expect these revenues to add to and complement our existing revenue stack. I will come onto that in a little bit. In terms of getting going, there is a lot of activity in the background, really sort of honing and optimizing. As part of that, in the first half, we signed a route-to-market contract with a particular counterparty that enables us to do this at scale. Just to highlight also that alternative revenues are not included in valuations or in the NAV today at all. So hopefully we can start to show some movement there as well from a valuation perspective, as well as EBITDA. Just to sort of highlight what we did in the first half on the new projects. Speaker 100:11:38We closed a relatively complex financing across the three projects, bearing in mind that we cannot raise capital at the TopCo given discounts to NAV, a feature of investment trust companies' listing rules. So we raised senior debt of GBP 141 million, representing about 70% of the construction cost. We added some more debt on Kirk and Monets Garden, not LM2, to the tune of GBP 30 million in the form of an export credit facility, which was competitively priced. Then just to say that having done all this work and put in a process in place, this funding structure is absolutely repeatable. It is likely to be at the margin different in certain ways as we continue to seek to improve the way we do things. But it does lay the groundwork, and there will be a lot of similarities, I expect, between the current financing and future funding. Speaker 100:12:40This is all despite equity markets being closed. We were always pleased to be able to grow despite that. Just on alternative revenues, we used a similar slide at our Capital Markets Day, which we had in May, at which time we presented an iteration to our then called three-year plan. We are now calling it our growth plan. That growth plan was iterated to basically allocate capital more efficiently, to focus on more new capacity growth and less augmentations, because that was just more straightforward from an equity funding perspective and equity requirement. We said more about alternative revenues, which I will speak to now. These alternative revenues essentially add to our revenue stack and therefore diversify our revenue base. They are naturally inversely correlated to the merchant revenues that are generated by our core utility scale fleet, which obviously do better in high volatility environments. Speaker 100:13:45Obviously, alternative revenues do worse in high volatility environments. So there is a natural layering in of two sets of revenue streams. To be honest, we will not mind how they out-turn. We just like that in combination, they should contribute to lower volatility in revenues and to more revenues, of course, and more revenues per megawatt. We spent a lot of time back-testing this using historical data and back-casting, and obviously live trials as well, the most recent one ending in March of this year. At the bottom of the slide, you have got a timeline, a simple timeline, showing what we did in the trial, what we are targeting by year end, which hopefully will grow past during next year. Of course, we are still committed to our GBP 25 million EBITDA target for this area as part of our growth plan. Speaker 100:14:40I like this slide a lot, especially in terms of the story it tells. Obviously, the pie charts, or the donuts, do not show the growth that is stated there as 10% or 9.5% to be more accurate. But what it does show is if you look at the inner circles or inner donuts, you can see that the contracted share of revenues, as opposed to merchant, has grown significantly. This is a function of the tolls that we had in place initially and those rolling off into a greater proportion of the portfolio in terms of floor contracts. We have still got quite a few to roll onto. So, the contracted revenue base is looking healthy, which was the aim when we carried out our debt refinancing last year, ahead of the financing that I have mentioned already on the new projects this year. Speaker 100:15:32This all speaks to our existing portfolio. Within the contracted revenue base, we see capacity markets generating a higher percentage of revenues, partly as capacity market contracts roll on, partly, and it is a small part relatively speaking, due to inflation every year at the contract start date. The anniversary, which is October, capacity market contracts reprice upwards with CPI. The tolling is still there, but that will start rolling off and be replaced by floor contracts, and then exceeded by, and it will all become floor contracts in due course. When you look at the merchant piece, I think what is useful to look at there is what we have been talking about for a long time. Speaker 100:16:17If you look at the first half of last year, trading was over 50% of total merchant revenues, but frequency response, broadly categorized as an ancillary service, was still a meaningful part. In the first half of this year, trading really is starting to take over as the main business of the company. Trading is essentially trading volumes of energy, whether through the wholesale market or making ourselves available to the control room, as opposed to responding to very short-term signals, variations in the frequency, precisely speaking, that trigger the import or export of power that cannot be traded because it is too live, too real-time, and it is naturally a smaller part of the market. This next slide, it goes through the NAV per share. We are very pleased with this outcome. Naturally, this eventually translates into EBITDA growth. The NAV at the end of last year was 113.3. Speaker 100:17:19The roll-forward effect is a combination of shorter lives on some projects, although others have long lives, but we do cap everything at 30 years, even if we own the land. Naturally, if projects are getting shorter, that would mean a negative roll-forward effect. Two other things take it positive. We have got certain fallow periods, for example, assumed for augmentations start to disappear. Naturally, because we have got upward-leaning revenue curve forecasts, you are heading towards that higher ground, at least from a NAV perspective, and it has a small effect to the positive. The next bar is much more meaningful. It is the revaluation of our incremental projects to fair value. The three projects that I mentioned are Cockenzie, Monets Garden, and Elland 2. These are now valued on a DCF basis and having IRRs in excess of the weighted average discount rate. Speaker 100:18:19Given the fact that there is a lot of megawatts involved here, and there will be just a highlight even more next year with the next phase of projects, it has a big effect on the NAV. Other updates are relatively small from construction costs and other things, and timings as well is another factor within the construction update. Revenue forecasts, small overall impact in terms of how we have done this. We will come onto that in a second, and operating costs. Net fund and SPV working capital is essentially cash flow from the projects. Operational debt costs are the debt servicing within the portfolio, and then you have got a mark to market on the interest rate swaps leading to 131.3. Speaking to the curves now, here you have got a typical chart that we have used many times before of the one hour in light blue or teal. Speaker 100:19:18Yellow is an hour and a half, and two hours is the dark blue. What we have done this period, and it is important to share, is the dashed line is the previous period. In other words, the end of 2025 curve. Most of the solid line is the new forecast, which over the longer term has headed higher. The actual forecasts that we received were the small dotted lines between now and 2030. The manager, with the board and its advisors, have decided to reset that front end, which would have, if taken on board, led to a significantly higher increase in NAV this period, and set the curve at the front end to essentially be a relatively straight line between current trading environment and 2030s third-party curve level, and it is effectively interpolated between the two. Speaker 100:20:25The rationale for that is, it makes little sense to assume third-party curves at the levels shown when actual trading is at the levels where we have reset them. For want of a better or more scientific approach, we have interpolated between the two. We assume 2030 simply because we thought that was a sensible timeframe to see essentially the underlying causes for these curves to be essentially over-optimistic in our opinion, namely skips, having a chance to come down certainly by 2030. The final point on this slide onto the right here is that the weighted average discount rate remained at a similar level to the past, which is 10.9%. Before going into conclusions, this is a sort of a market slide. We continue to be somewhere in the teens, at 14% of the market. It is a rapidly evolving market, but not exclusively. Speaker 100:21:25We are still the largest. Zenobē and Statera, if you have studied these charts before, have been there for a long time. A new entrant has been Copenhagen Infrastructure Partners with a meaningful new project at 500 MW. Voltwise, which bought SMS plc's assets and is growing itself, is shown there as well. You have Foresight here, who acquired Harmony's assets. It is still a relatively small field, I think is a key point to highlight. There will be one or two emerging players. In particular, Fidra Energy is building a large project at Thorpe Marsh and another one as well. They are expected to be a large operator. They are backed by EIG and the National Wealth Fund. But other than that, it is a pretty small overall playing field in the U.K., by number. Speaker 100:22:19In terms of highlights, driving value from our operational base is a key focus, and between financings, we have more time to do this. We are obviously growing our team as well, and we are finding ways of incrementally adding revenues or incrementally taking cost out, and we look forward to reporting more on that at the next stage, whether it is at Q3 or full year, remains to be seen. But we are excited about how much cost we can take out of the business by doing things in innovative ways. Again, more details on that in the future. The following bullets are mainly about the growth plan, augmentations, adding 198 MWh of capacity. We are heading towards two hours very quickly. We are at just under 1.8 hours now. It is nice to see that. It has a positive impact on revenues. Speaker 100:23:11We're under construction on the incremental three projects, nearly 400 MW, with energization in the back half of next year. We're progressing well on the development and progressing to construction readiness on the incremental 777 MW, even if we are still waiting for the Rayleigh grid connection offer to come back. We're evaluating design and, in particular, duration very closely. There's a lot of new battery offerings to serve that part of the market now emerging as well, which is very interesting to look at. Scaling up alternative revenues, we remain very excited about this area. We're honing our strategy and look forward to providing further updates with an initial step of 20 MW by the end of this year in terms of what we're reporting and committing to. That's it. With that, I'll go back to Rupert. Thank you. Operator00:24:14Ben, thank you. Informative as always. Again, if any of the audience would like to ask a question, please send those in online. We have three or four here, so we can kick off while others want to add to the list. Ben, first question, are you seeing any changes in battery technology coming to sufficient maturity that you'd start to consider them for the company? Speaker 100:24:46Starting to, and the only one we're starting to see is sodium-ion. The technology has various benefits and various drawbacks. Today, it's still more expensive than lithium-ion, so we're very unlikely to buy it. It has also less density, so it takes up more room. On the flip side, it's considered and is safer. The likelihood of thermal runaway is smaller. Sodium is more abundant, so the likelihood is that once it gets and competes with lithium successfully, is that the bill of materials there will end up lower, and it may completely take over in due course. It's easier to measure its state of charge, so you can use the battery more fully. Doesn't go to degradation necessarily, but it goes to potentially revenues. There's a few other features. Speaker 100:25:44Sodium-ion is the only one that is being heavily backed also by the Chinese manufacturers as well. CATL have announced a product in this area, so I would expect a big push from the manufacturers in this area, and it would be interesting to see the world not dependent on lithium for stationary batteries. I suspect the density is not good enough for car batteries, although you may see hybrid batteries, because sodium also operates well at a wider temperature range as well, so that could be good for many uses. Operator00:26:20Thank you. Trading revenue in H1 2026 were lower than the same period last year. Can you comment on reasons? The wholesale electricity price was negative on eight occasions in September to date, while high on average overall. How has this impact recent trading? Speaker 100:26:46First half trading and recent trading. Operator00:26:49Yeah. Speaker 100:26:50The first half was generally flatter. We saw an uptick in skip rates for batteries. I will come onto that in a second. Slightly flatter markets or flatter markets at certain times. I mean, there were certain months that were pretty volatile, but overall, there were some also weaker months. Overall market conditions were a bit tougher. But within our portfolio, what has really impacted things is uptime. As I mentioned, our Glastonbury project, which was 50 MW, was off and not really generating until well into Q2. We had Stairfoot, which was off, I cannot remember exactly how long, but two to three months. That is 40 MW, and that is basically 4% of the portfolio. We did have one other asset that was offline for technical reasons, for which we have made a business interruption insurance claim, and that gap will probably be filled in with that. Speaker 100:27:55It was not our site that was at issue, it was the network. There is a handful of factors that led to lower uptime as well. The last factor being DNO outages. We are connected to distribution network operators, or DNOs for short, across our current fleet. And they need to sometimes do, and usually just during the better months of the year, tend to take assets offline, like ours, which they are allowed to do to either reinforce the network or do scheduled maintenance, and we saw quite a lot of that this year. There is that. Then in terms of the skip rate point, it impacted in particular in Q2 and into Q3 a bit. Speaker 100:28:44The very hot months that we've seen has led to some press on this as well, but the control room needing to be more cautious about how extreme certain scenarios might be in any half-hourly period. In other words, might we see certain gas plants go offline suddenly? Might we see even nuclear plants go offline in 40-degree heat, et cetera, et cetera? You've got sort of unknown decreases in behind-the-meter generation because of the 2 million rooftops we've got in this country, which keeps going up. We've got EV charging profiles starting to make a dent in terms of what happens on the network. General caution was introduced in the control room, and that means that they need more of the flex that's available to them. That's made up of batteries, pumped storage hydro, gas, and at the margin, even generating assets like Drax's biomass asset. Speaker 100:29:46The ones that need scheduling soonest, for whatever reason, even if they're more expensive, are basically use-them-or-lose-them technologies. They're basically either you use them or you then don't have them available to you. In a more cautious environment, you have more of those used, and the outturn might still not be that bad, but you've dealt with a, you've mitigated a potential situation. But it does mean that the batteries are forced to compete in a reduced pot because privileged access in that context has been given to the less efficient technologies. That's the core of the skip rate issue, and it's made worse when risk management and caution increases in the control room. This is where the argument lies around how high skips should be. Speaker 100:30:36Over the next few years, we will see, we do expect anyway, given that half the gas fleet is over 30 years old, 15 over 30 GW approximately, we do expect them to either be offline a lot more or just go offline permanently at end of life, and batteries will increase. Naturally, the skip rate issue should start diminishing as the overall mix of flexible assets just tends towards being more batteries. But this is a big factor and one of the factors why trading revenues were weaker in the first half. Operator00:31:10Thank you, Ben. Any updates on NESO control room? Speaker 100:31:16Yes. There's always a dialogue going on. I've just spoken to the risk management point and the need to address sort of relative extreme situations and taking a sort of mid-winter approach to managing the network in the middle of the summer, essentially. That's one thing. Probably the most incrementally significant one, specifically for batteries, is what we've called before GC0166. That's the sort of grid code modification that was consulted on for years in the end. It's much slower than expected, but was approved by Ofgem in September of last year. We'd hoped that this would result in batteries becoming fully visible to the control room by the middle of this year at the latest. Speaker 100:32:10That's been pushed back to early November, simply to make sure that the information that needs to be provided to NESO, both the type and how frequently it needs to be provided, is plugged in and basically onboarded all the assets, all the many over 100 battery assets that exist across the country are correctly onboarded onto the Balancing Mechanism system, which requires Elexon, which is the clearing house subsidiary of NESO. That, when it does come online, we do hope will have a meaningful impact because in those instances where NESO has to say, "Well, we need as much flex as possible or allow for more flex because we don't know what the extreme environment might be," because of the reasons I gave earlier, but outages of generation plants is a big one. Speaker 100:33:10By then, they will be able to see, "Oh, gosh, we've got a lot more battery capacity than we expected because so far we've been assuming 30 minutes worth. We've actually got two hours in that one," and so on. We don't need to be quite as cautious in terms of using less efficient technologies. We can let them go and focus more on batteries, which are basically cheaper, and start to see better utilization of batteries on the back of that. That's certainly what's been indicated by NESO. Operator00:33:45Thank you. Can you comment on dividend policy over the next two to three years? Speaker 100:33:55This is, if I may pass the buck, is a board matter. Operator00:33:59Sure. Speaker 100:33:59The board is planning to give an update. They have committed to this at some stage, I think before the end of the year. I can't remember exactly the timing. Apologies. There's a commitment to do so. If you do listen to RNS messages from the last few quarters, however, we have indicated that there's a wish to grow this company, that there's a sort of energy transition going on here, and there's a wish to recycle capital. I won't say more now. Fundamentally, this business is set up to provide a balance between income and capital growth as well. Operator00:34:35Yeah. Okay. I suspect there are also parts of this question or next questions that you can answer and those that probably are best parked. Anyway, let me just read them out. When do you expect the new 777 MW to be included in NAV at DCF rather than cost? Is this likely to be the next big NAV boost? Speaker 100:34:59To the second part of the question, yes, it is. Operator00:35:01What is the approximate revenue per megawatt from the alternative revenues? How fast can you ramp this up? Speaker 100:35:11Okay, got it. There's two parts to the question there. On the incremental 777- Operator00:35:15Yeah Speaker 100:35:17We will revalue them at the quarter end following financial close. That might be staggered in the end. We will see. Operator00:35:24Yeah. Speaker 100:35:25Hoping we can do it as one financing, but if it needs to be staggered because Rayleigh's a bit behind or something else, it will be staggered. That will be a meaningful impact and very round numbers. You could probably go, "What was the uplift per megawatt - Operator00:35:41Yeah Speaker 100:35:42this quarter?" And say something vaguely similar for these assets incrementally as well, subject to- Operator00:35:49But a 2027 rather than 2026. Speaker 100:35:51Correct, yes. The timing of that will be 2027. Operator00:35:54Yeah. Speaker 100:35:55Most likely Q3 or Q4. In terms of alternative revenues, we have highlighted that the GBP per megawatt hour achieved in the trial was in the region of GBP 23. We need to see this strategy operate in more different backdrops and a larger scale before we commit to, or we just start to report the actual numbers. GBP 5-GBP 10 is what we have indicated, which is similar to the level of revenues that we are earning from the existing fleet today. It is scalable across probably approaching 50% of our megawatts, hopefully relatively cautiously. There is a lot to go for here. I do not want to make any new- Operator00:36:45Sure Speaker 100:36:45forecasts or commitments on behalf of the company now, but we do stick and stand by our GBP 25 million EBITDA target. Operator00:36:54Okay. Outside of your alternative revenue strategy, are you using different optimizers for your various sites or just one? Speaker 100:37:04Sorry, was this alternative revenues or something else? Sorry. Operator00:37:06No, outside of alternative revenues. So, yeah. So, really a question around how many optimizers do we use? Speaker 100:37:12Yeah, absolutely. We've got five or six different optimizers across the fleet. The majority of the floors are, this is all public information, of the actual floors are with EDF and Statkraft. We have an effective floor through essentially an ISDA with an insurance company for a significant portion of the rest. Operator00:37:42Okay. What specifically needs to happen between now and 2030 for revenues to converge with the third-party forecasts? Speaker 100:37:56Very good question. When you look at the macro, you can almost dare to get a bit excited because you've got growing electricity demand, you've got a couple of nukes coming offline, you've got Drax generating less power as well. That's a commitment that's made that kicks in Q2 next year, I think, if I remember rightly. That's a huge asset. It's going to overall generate half the output that it has done to date, somewhere close to 4 GW. So we've got demand increasing, we've got supply, especially dispatchable base load-like supply decreasing, and we've got a huge growth to fill in that gap in renewable generation, such that it's likely to take renewable generation from 40-something percent to over 80% in the next four or five years. Speaker 100:38:51All of that translates into a very, very much more volatile environment, with the bottlenecks and constraints that exist in the network still remaining a serious problem, even if lots of money is being spent to increase the amount of power that can flow at those constraints. You see all of that. You see the likelihood that the gas assets that mostly behave like peakers these days with flexible generation, I expect a proportion of those, potentially a fairly large proportion, as I mentioned earlier, potentially half, given that half are over 30 years old now, starting to go offline or having more issues. Speaker 100:39:35So really, it means that batteries go from one of the smaller sources of flexibility, especially given the shorter duration of the fleet, to a much larger proportion of peak megawatts and the amount of time that they can operate for, and therefore megawatt hours or gigawatt hours. All of that gives a good reason why the overall curve should be heading higher from a macro perspective in the absence of skips. The other very important thing that we need, though, is a reduction in skip rates. Because at the moment, if you have got the control room purely to manage risk, it has to turn certain assets on first, whether that is dispatching or scheduling interconnectors, pumped storage hydro, gas assets, potentially Drax's biomass asset, and so on. Turning all those on or having them available first and therefore prioritized, it naturally means that batteries are left to last. Speaker 100:40:35As we get more visibility of batteries, as we have many more batteries as a percentage of total flex, that effect should decrease. Hopefully, I do think another thing that needs to happen, which I am less confident about, is the amount of automation and computer intelligence to help in those scenarios as well. But the combination of all these things, processes, mix of flex, and in particular, the growing percentage of batteries, and technology and also computing power in the control room should all contribute to all the flexible market being available to batteries, not just what remains after other assets have been prioritized. That is what is needed. Operator00:41:25Thank you, Ben. Another question on the alternative revenues. Speaker 100:41:29Okay. Operator00:41:29Specifically around what the trials have achieved in terms of The trials have significantly beaten the 5-10 MWh you are using to get to the GBP 25 million. Can you explain why you expect this to be so much lower than the 23 MWh you have seen in the trials? Speaker 100:41:56I certainly can explain it. I am just trying to word it in a useful way while also not disclosing anything we do not want to disclose. But essentially, we are extracting a margin, essentially between the price that can be captured at spot by batteries and somewhere in the towards the end market, without giving that away. Operator00:42:27Yeah. Speaker 100:42:27That margin can vary significantly according to the amount of renewable generation on the system. During the trial period, there was quite a lot of wind, so you have to be cautious about where the outturn is. Having said that, without changing our forecast or assumptions, given that we are heading from 40-something percent, 45-odd percent wind and solar in this country to 80%, we do expect the amount of time that renewables together generate significantly more than might be expected from them to grow, that having a favorable impact on wholesale prices. Let us see how everything pans out, but we do have to be cautious here just because Operator00:43:24Yeah Speaker 100:43:24one time, a short period. Operator00:43:26Sure. What is the impact on the BESS market from higher gas prices as a result of the Iran war? Are we seeing a rerun of the Ukraine war impact? Speaker 100:43:40The gas price is in the foothills of the Everest share price shape that we not share price, gas price shape that we saw between 2021 and 2024, I suppose. But it is at multi-year highs now, and it absolutely increases volatility in the market, and we are seeing that now. Sorry, I do not think I spoke to the recent trading question earlier. Operator00:44:06Yeah. Speaker 100:44:07It gives me a second chance. If you look at the Modo Index or BESS Analytics or any other platform that shows recent trading, we are close to highs for the year. Operator00:44:22Thank you. Speaker 100:44:22In terms of volatility. Operator00:44:23Yeah. Can you explain why balancing revenues are negative, and what needs to happen to get this to turn positive again? Speaker 100:44:35I do not know what is meant by balancing revenues being negative. I am going to guess that that is looking at the BESS Analytics Operator00:44:42Yeah Speaker 100:44:42portal. I do not know exactly how they construct this, but my guess is that there is an assumption in that model that assumes that you only charge in the Balancing Mechanism, only export in the wholesale, or largely do that. That means that you are only incurring costs in the Balancing Mechanism rather than doing more balanced trading in terms of importing and exporting in the Balancing Mechanism. But the overall line that goes through the overall chart, that is the sum of everything, is what we need to look at and is the number that is heading higher. Hopefully, that is useful to the person who asked. Operator00:45:18Okay. Speaker 100:45:19I can say something offline if they want, of course. Operator00:45:21Thanks, Ben. There are a couple of questions here around PrimeStone and the dialogue there. I think, look, a couple of comments there. I speak on behalf of the manager, Gresham House, here, and as a colleague of Ben's and Harry's. Our goal is to maximize shareholder value from delivering on our growth strategy. I think the manager's been very clear on that. Obviously, the board have had a number of constructive dialogues with PrimeStone. There have been various RNSs released, which have obviously been seen by everyone. I think that there's a common goal here, which is to see a higher share price, see a reduction in the NAV discount, and to maximize returns for all shareholders. I think getting into any discussion or debate beyond that doesn't serve any purpose here. Operator00:46:29Suffice to say that I know that the board and its advisors will continue to have a dialogue with PrimeStone, as well as all other shareholders who they have consulted over recent weeks and months. We, as the manager, will be involved as and when the board deem it appropriate. In the meantime, we will continue to have a laser focus on driving and maximizing shareholder value. Speaker 100:46:58Nothing to add. Operator00:47:02I think, Ben, that's all the questions that we've had from the audience. I think we are obviously at 10:45, 10:47, so I think we'll close the formal session there. I'd like to thank everyone for attending this morning's presentation. Ben and Harry, thank you for your contributions as ever. Thank you to all our shareholders for their patience and support over the last 18 months as we've been on this recovery journey. I think the team continue to innovate, continue to execute, and as I say, remain absolutely laser-focused on driving and maximizing shareholder value. If anyone has any further questions or would like to follow up directly with the manager, we'll obviously be delighted to do so. In the meantime, thank you again for attending this morning, and hopefully see everyone soon. Thank you. Speaker 100:48:13Thank you.Read morePowered by